IAC logo
IAC Assessment: WI0465
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0465
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2004
Principal Product Aluminum die cast brackets
NAICS 332710 - Machine Shops
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 96,500
Annual Production 240,000 Pieces
Production Hrs. Annual 7,200
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $96,362 2,906,442 kWh $0.03
Electricity Demand $69,704 6,850 kW-months/year $10.18
Electricity Fees $22,100 - $ -
Natural Gas $40,283 8,171 MMBtu $4.93
TOTAL ENERGY COSTS $240,449
RECOMMENDED SAVINGS* $30,165 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,318
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz)
$ kWh $ kW-months/year $ MMBtu $ gal
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$7,760
Cost:
$16,000
$7,760 119,938 - - - - - - $7,760
119,938
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,432
Cost:
$11,183
$4,909 140,256 $2,523 235 - - - - $4,909
140,256
kWh
$2,523
235
kW-months/year
-
-
MMBtu
-
-
gal
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,044
Cost:
$1,680
$2,014 57,534 $1,030 96 - - - - $2,014
57,534
kWh
$1,030
96
kW-months/year
-
-
MMBtu
-
-
gal
04: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$5,458
Cost:
$18,000
- - - - $(-3,333) (-676) $8,791 38,220 -
-
kWh
-
-
kW-months/year
$(-3,333)
(-676)
MMBtu
$8,791
38,220
gal
05: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$2,736
Cost:
$1,900
- - - - $2,736 555 - - -
-
kWh
-
-
kW-months/year
$2,736
555
MMBtu
-
-
gal
06: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$1,882
Cost:
$2,500
- - $1,882 175 - - - - -
-
kWh
$1,882
175
kW-months/year
-
-
MMBtu
-
-
gal
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,126
Cost:
$700
- - - - $1,126 228 - - -
-
kWh
-
-
kW-months/year
$1,126
228
MMBtu
-
-
gal
08: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$727
Cost:
-
- - - - $727 148 - - -
-
kWh
-
-
kW-months/year
$727
148
MMBtu
-
-
gal
TOTAL RECOMMENDED Savings:
$30,165
Cost:
$51,963
$14,683 317,728 $5,435 506 $1,256 255 $8,791 38,220 $14,683
317,728
kWh
$5,435
506
kW-months/year
$1,256
255
MMBtu
$8,791
38,220
gal
TOTAL IMPLEMENTED Savings:
$16,318
Cost:
$27,883
$12,669 260,194 $2,523 235 $1,126 228 - - $12,669
260,194
kWh
$2,523
235
kW-months/year
$1,126
228
MMBtu
-
-
gal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz)