Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 2004 |
Principal Product | Heat Exchanger Components |
NAICS | 332410 - Power Boiler and Heat Exchanger Manufacturing |
SIC | 3443 - Fabricated Plate Work (boiler Shops) |
Sales | $10,000,000-$50,000,000 |
# of Employees | 114 |
Plant Area (Sq.Ft.) | 160,000 |
Annual Production | 780,000 Pieces |
Production Hrs. Annual | 2,125 |
Location (State) | WI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $64,943 | 1,934,400 | kWh | $0.03 |
Electricity Demand | $75,841 | 7,302 | kW-months/year | $10.39 |
Natural Gas | $75,655 | 10,209 | MMBtu | $7.41 |
TOTAL ENERGY COSTS | $222,439 | |||
RECOMMENDED SAVINGS* | $32,621 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,842 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $9,842 Cost: $30,850 |
$3,583 | 101,500 | $6,259 | 573 | - | - | - | - | - | - | - | - |
$3,583 101,500 kWh |
$6,259 573 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $7,059 Cost: $1,200 |
- | - | - | - | $7,059 | 953 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$7,059 953 MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $4,749 Cost: $9,500 |
$(-769) | 7,926 | - | - | - | - | $5,518 | 2,280,000 | - | - | - | - |
$(-769) 7,926 kWh |
- - kW-months/year |
- - MMBtu |
$5,518 2,280,000 Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $4,435 Cost: $10,000 |
- | - | - | - | $(-855) | 115 | - | - | $5,290 | 8,141 | - | - |
- - kWh |
- - kW-months/year |
$(-855) 115 MMBtu |
- - Tgal |
$5,290 8,141 gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT |
Savings: $3,550 Cost: - |
- | - | - | - | - | - | - | - | - | - | $3,550 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
$3,550 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,755 Cost: $1,000 |
- | - | - | - | $1,755 | 237 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,755 237 MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,231 Cost: $740 |
$501 | 14,205 | $730 | 67 | - | - | - | - | - | - | - | - |
$501 14,205 kWh |
$730 67 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $32,621 Cost: $53,290 |
$3,315 | 123,631 | $6,989 | 640 | $7,959 | 1,305 | $5,518 | 2,280,000 | $5,290 | 8,141 | $3,550 | - | $3,315 123,631 kWh |
$6,989 640 kW-months/year |
$7,959 1,305 MMBtu |
$5,518 2,280,000 Tgal |
$5,290 8,141 gal |
$3,550 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,842 Cost: $30,850 |
$3,583 | 101,500 | $6,259 | 573 | - | - | - | - | - | - | - | - | $3,583 101,500 kWh |
$6,259 573 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Administrative Changes |