Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 2004 |
Principal Product | Vinyl Sheeting |
NAICS | 326113 - Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing |
SIC | 3081 - Unsupported Plastics Film & Sheet |
Sales | $10,000,000-$50,000,000 |
# of Employees | 78 |
Plant Area (Sq.Ft.) | 105,000 |
Annual Production | 80,000,000 Pounds |
Production Hrs. Annual | 6,000 |
Location (State) | WI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $351,337 | 11,294,699 | kWh | $0.03 |
Electricity Demand | $226,140 | 29,715 | kW-months/year | $7.61 |
Electricity Fees | $81,326 | - | $ | - |
Natural Gas | $155,122 | 24,064 | MMBtu | $6.45 |
TOTAL ENERGY COSTS | $822,525 | |||
RECOMMENDED SAVINGS* | $96,191 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,554 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $58,920 Cost: $59,780 |
$58,920 | 1,796,328 | - | - | - | - | - | - | - | - |
$58,920 1,796,328 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $12,493 Cost: $1,500 |
$6,880 | 209,770 | $5,613 | 699 | - | - | - | - | - | - |
$6,880 209,770 kWh |
$5,613 699 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,930 Cost: $1,040 |
$1,944 | 59,270 | $986 | 123 | - | - | - | - | - | - |
$1,944 59,270 kWh |
$986 123 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,441 Cost: - |
$1,284 | 39,165 | $1,397 | 174 | - | - | - | - | $(-240) | - |
$1,284 39,165 kWh |
$1,397 174 kW-months/year |
- - MMBtu |
- - Tgal |
$(-240) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,285 Cost: $1,000 |
- | - | - | - | $2,285 | 354 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,285 354 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $10,814 Cost: $23,430 |
$7,260 | 221,340 | $3,554 | 443 | - | - | - | - | - | - |
$7,260 221,340 kWh |
$3,554 443 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $4,125 Cost: $2,500 |
- | - | - | - | - | - | $4,125 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$4,125 - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $2,183 Cost: $1,200 |
- | - | - | - | $2,183 | 338 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,183 338 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $96,191 Cost: $90,450 |
$76,288 | 2,325,873 | $11,550 | 1,439 | $4,468 | 692 | $4,125 | - | $(-240) | - | $76,288 2,325,873 kWh |
$11,550 1,439 kW-months/year |
$4,468 692 MMBtu |
$4,125 - Tgal |
$(-240) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,554 Cost: $2,240 |
$3,228 | 98,435 | $2,383 | 297 | $2,183 | 338 | - | - | $(-240) | - | $3,228 98,435 kWh |
$2,383 297 kW-months/year |
$2,183 338 MMBtu |
- - Tgal |
$(-240) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes |