IAC logo
IAC Assessment: WI0493
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0493
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2005
Principal Product Aluminum Castings
NAICS 331523 - Nonferrous Metal Die-Casting Foundries
SIC 3369 - Nonferrous Foundries, Nec
Sales $50,000,000-$100,000,000
# of Employees 450
Plant Area (Sq.Ft.) 270,000
Annual Production 20,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $571,983 17,833,400 kWh $0.03
Electricity Demand $335,292 28,813 kW-months/year $11.64
Electricity Fees $57,504 - $ -
Natural Gas $871,303 124,045 MMBtu $7.02
TOTAL ENERGY COSTS $1,836,082
RECOMMENDED SAVINGS* $110,704 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$29,163
Cost:
$49,680
$19,199 568,008 $9,964 811 - - - - $19,199
568,008
kWh
$9,964
811
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$26,534
Cost:
$11,200
- - - - $26,534 3,754 - - -
-
kWh
-
-
kW-months/year
$26,534
3,754
MMBtu
-
-
$
03: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$22,020
Cost:
-
- - - - - - $22,020 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$22,020
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$12,731
Cost:
$1,920
$8,074 238,889 $4,657 379 - - - - $8,074
238,889
kWh
$4,657
379
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$13,287
Cost:
$1,300
$13,287 393,107 - - - - - - $13,287
393,107
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,969
Cost:
$2,000
$3,152 93,250 $3,817 311 - - - - $3,152
93,250
kWh
$3,817
311
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$110,704
Cost:
$66,100
$43,712 1,293,254 $18,438 1,501 $26,534 3,754 $22,020 - $43,712
1,293,254
kWh
$18,438
1,501
kW-months/year
$26,534
3,754
MMBtu
$22,020
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost