Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2005
Principal Product Conveyors
NAICS 333922 - Conveyor and Conveying Equipment Manufacturing
SIC 3535 - Conveyors And Conveying Equipment
Sales $10,000,000-$50,000,000
# of Employees 145
Plant Area (Sq.Ft.) 210,000
Annual Production 8,750 Pieces
Production Hrs. Annual 2,625
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $69,023 1,965,960 kWh $0.04
Electricity Demand $76,586 7,104 kW-months/year $10.78
Electricity Fees $28,081 - $ -
Natural Gas $35,845 3,592 MMBtu $9.98
TOTAL ENERGY COSTS $209,535
RECOMMENDED SAVINGS* $54,503 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,474
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$21,656
Cost:
$6,750
- - - - - - $21,656 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$21,656
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,914
Cost:
$57,240
$7,563 204,965 $10,351 914 - - - - - - $7,563
204,965
kWh
$10,351
914
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,904
Cost:
-
- - - - $4,904 491 - - - - -
-
kWh
-
-
kW-months/year
$4,904
491
MMBtu
-
-
$
-
-
$
04: 3.7137 REPLACE CLOTH RAGS WITH PAPER TOWELS Savings:
$3,540
Cost:
-
- - - - - - - - $3,540 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$3,540
-
$
05: 4.426 MODIFY WORKLOAD Savings:
$2,970
Cost:
-
- - - - - - $2,970 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,970
-
$
-
-
$
06: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$1,445
Cost:
$2,000
$1,445 39,165 - - - - - - - - $1,445
39,165
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,397
Cost:
-
$623 16,878 $1,014 90 - - $(-240) - - - $623
16,878
kWh
$1,014
90
kW-months/year
-
-
MMBtu
$(-240)
-
$
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$677
Cost:
$1,280
$257 6,974 $420 37 - - - - - - $257
6,974
kWh
$420
37
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$54,503
Cost:
$67,270
$9,888 267,982 $11,785 1,041 $4,904 491 $24,386 - $3,540 - $9,888
267,982
kWh
$11,785
1,041
kW-months/year
$4,904
491
MMBtu
$24,386
-
$
$3,540
-
$
TOTAL IMPLEMENTED Savings:
$44,474
Cost:
$63,990
$7,563 204,965 $10,351 914 $4,904 491 $21,656 - - - $7,563
204,965
kWh
$10,351
914
kW-months/year
$4,904
491
MMBtu
$21,656
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost