IAC logo
IAC Assessment: WI0499
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0499
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2005
Principal Product Fabrication
NAICS 331210 - Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3312 - Blast Furnaces And Steel Mills
Sales $50,000,000-$100,000,000
# of Employees 70
Plant Area (Sq.Ft.) 60,000
Annual Production 2,500,000 Pounds
Production Hrs. Annual 2,100
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $28,831 721,572 kWh $0.04
Electricity Demand $25,098 2,892 kW-months/year $8.68
Electricity Fees $12,122 - $ -
Natural Gas $62,682 6,502 MMBtu $9.64
TOTAL ENERGY COSTS $128,733
RECOMMENDED SAVINGS* $73,113 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $63,713
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
01: 4.4260 MODIFY WORKLOAD Savings:
$42,000
Cost:
$3,600
- - - - - - - - $42,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$42,000
-
$
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$9,925
Cost:
$600
- - - - $9,925 1,030 - - - - - - -
-
kWh
-
-
kW-months/year
$9,925
1,030
MMBtu
-
-
MMBtu
-
-
$
-
-
$
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$9,400
Cost:
-
- - - - - - - - - - $9,400 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
$9,400
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,192
Cost:
$22,500
$2,765 65,841 $3,427 376 - - - - - - - - $2,765
65,841
kWh
$3,427
376
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$4,285
Cost:
$300
- - - - - - $85 1 $4,200 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$85
1
MMBtu
$4,200
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$967
Cost:
$1,280
$348 8,272 $619 68 - - - - - - - - $348
8,272
kWh
$619
68
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
07: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$344
Cost:
-
$153 3,654 $191 21 - - - - - - - - $153
3,654
kWh
$191
21
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$73,113
Cost:
$28,280
$3,266 77,767 $4,237 465 $9,925 1,030 $85 1 $46,200 - $9,400 - $3,266
77,767
kWh
$4,237
465
kW-months/year
$9,925
1,030
MMBtu
$85
1
MMBtu
$46,200
-
$
$9,400
-
$
TOTAL IMPLEMENTED Savings:
$63,713
Cost:
$28,280
$3,266 77,767 $4,237 465 $9,925 1,030 $85 1 $46,200 - - - $3,266
77,767
kWh
$4,237
465
kW-months/year
$9,925
1,030
MMBtu
$85
1
MMBtu
$46,200
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Gas Personnel Changes Administrative Changes