IAC logo
IAC Assessment: WI0508
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0508
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2006
Principal Product plastic parts, trays, totes, stands, clamshells
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 200,000
Annual Production 180 Tons
Production Hrs. Annual 4,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $509,790 14,690,400 kWh $0.03
Electricity Demand $334,582 31,033 kW-months/year $10.78
Natural Gas $37,988 4,257 MMBtu $8.92
TOTAL ENERGY COSTS $882,360
RECOMMENDED SAVINGS* $207,620 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 4.132 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST Savings:
$147,000
Cost:
-
- - - - $147,000 - -
-
kWh
-
-
kW-months/year
$147,000
-
$
02: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$30,404
Cost:
$5,200
- - - - $30,404 - -
-
kWh
-
-
kW-months/year
$30,404
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$8,872
Cost:
-
- - $8,872 995 - - -
-
kWh
$8,872
995
kW-months/year
-
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$4,951
Cost:
-
$2,216 60,874 $2,735 242 - - $2,216
60,874
kWh
$2,735
242
kW-months/year
-
-
$
05: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$4,609
Cost:
$2,100
$4,609 126,612 - - - - $4,609
126,612
kWh
-
-
kW-months/year
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,905
Cost:
$1,280
$1,804 49,552 $2,101 186 - - $1,804
49,552
kWh
$2,101
186
kW-months/year
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,615
Cost:
-
$1,207 33,156 $1,408 124 - - $1,207
33,156
kWh
$1,408
124
kW-months/year
-
-
$
08: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,015
Cost:
$3,200
$878 24,117 $1,137 101 - - $878
24,117
kWh
$1,137
101
kW-months/year
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,628
Cost:
$1,773
$760 20,888 $868 90 - - $760
20,888
kWh
$868
90
kW-months/year
-
-
$
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,154
Cost:
$600
$1,154 41,472 - - - - $1,154
41,472
kWh
-
-
kW-months/year
-
-
$
11: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$467
Cost:
$156
$467 12,830 - - - - $467
12,830
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$207,620
Cost:
$14,309
$13,095 369,501 $17,121 1,738 $177,404 - $13,095
369,501
kWh
$17,121
1,738
kW-months/year
$177,404
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $