IAC Assessment: WI0525
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0525
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2006
Principal Product Bearing Caps and Clutch Plates
NAICS 332991 - Ball and Roller Bearing Manufacturing
SIC 3562 - Ball And Roller Bearings
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 71,000
Annual Production 18,000,000 Pieces
Production Hrs. Annual 8,400
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $524,927 15,539,407 kWh $0.03
Electricity Demand $194,102 26,497 kW-months/year $7.33
Natural Gas $157,124 179,923 MMBtu $0.87
TOTAL ENERGY COSTS $876,153
RECOMMENDED SAVINGS* $34,106 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,775
Cost:
$23,040
$10,520 296,352 $3,255 423 - - $10,520
296,352
kWh
$3,255
423
kW-months/year
-
-
$
02: 4.426 MODIFY WORKLOAD Savings:
$11,666
Cost:
$9,000
- - - - $11,666 - -
-
kWh
-
-
kW-months/year
$11,666
-
$
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$4,600
Cost:
-
- - - - $4,600 - -
-
kWh
-
-
kW-months/year
$4,600
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$3,880
Cost:
-
$1,770 49,867 $2,110 242 - - $1,770
49,867
kWh
$2,110
242
kW-months/year
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$185
Cost:
$400
$185 5,211 - - - - $185
5,211
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$34,106
Cost:
$32,440
$12,475 351,430 $5,365 665 $16,266 - $12,475
351,430
kWh
$5,365
665
kW-months/year
$16,266
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes