IAC logo
IAC Assessment: WM0002
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0002
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2012
Principal Product Industrial Radiators
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3444 - Sheet Metalwork
Sales $10,000,000-$50,000,000
# of Employees 190
Plant Area (Sq.Ft.) 175,000
Annual Production 20,000 Pieces
Production Hrs. Annual 3,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $119,491 1,659,600 kWh $0.07
Electricity Demand $86,653 7,632 kW-months/year $11.35
Electricity Fees $54,563 - $ -
Natural Gas $58,676 6,130 MMBtu $9.57
TOTAL ENERGY COSTS $319,383
RECOMMENDED SAVINGS* $126,184 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $55,728
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
01: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$56,454
Cost:
-
- - $47,711 4,200 $8,743 - - - - - -
-
kWh
$47,711
4,200
kW-months/year
$8,743
-
$
-
-
MMBtu
-
-
lb
02: 2.7134 USE PHOTOCELL CONTROLS Savings:
$875
Cost:
$750
$875 13,172 - - - - - - - - $875
13,172
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$52,844
Cost:
$55,770
$36,265 506,189 $16,579 1,460 - - - - - - $36,265
506,189
kWh
$16,579
1,460
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$243
Cost:
$30
$243 3,475 - - - - - - - - $243
3,475
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,425
Cost:
$500
- - - - - - $1,425 151 - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,425
151
MMBtu
-
-
lb
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$11,459
Cost:
-
$11,459 159,952 - - - - - - - - $11,459
159,952
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,884
Cost:
-
- - - - - - - - $2,884 18,000 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$2,884
18,000
lb
TOTAL RECOMMENDED Savings:
$126,184
Cost:
$57,050
$48,842 682,788 $64,290 5,660 $8,743 - $1,425 151 $2,884 18,000 $48,842
682,788
kWh
$64,290
5,660
kW-months/year
$8,743
-
$
$1,425
151
MMBtu
$2,884
18,000
lb
TOTAL IMPLEMENTED Savings:
$55,728
Cost:
$55,770
$36,265 506,189 $16,579 1,460 - - - - $2,884 18,000 $36,265
506,189
kWh
$16,579
1,460
kW-months/year
-
-
$
-
-
MMBtu
$2,884
18,000
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)