IAC logo
IAC Assessment: WM0098
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0098
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2016
Principal Product Treatment of Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 11
Plant Area (Sq.Ft.) 196,020
Annual Production 1,100,000 Units
Production Hrs. Annual 8,760
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $398,678 7,398,639 kWh $0.05
Electricity Demand $119,950 13,948 kW-months/year $8.60
Electricity Fees $(-33,005) - $ -
Natural Gas $36,186 7,348 MMBtu $4.92
TOTAL ENERGY COSTS $521,809
RECOMMENDED SAVINGS* $46,893 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,988
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$31,522
Cost:
$56
$24,968 462,359 $6,554 762 - - - - - - $24,968
462,359
kWh
$6,554
762
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,985
Cost:
$6,397
$1,689 31,440 $1,296 151 - - - - - - $1,689
31,440
kWh
$1,296
151
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,494
Cost:
$4,661
- - - - - - $3,494 710 - - -
-
kWh
-
-
kW-months/year
-
-
$
$3,494
710
MMBtu
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,481
Cost:
-
$2,020 37,498 $461 54 - - - - - - $2,020
37,498
kWh
$461
54
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,011
Cost:
$1,000
- - - - - - $1,011 205 - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,011
205
MMBtu
-
-
$
06: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$2,334
Cost:
-
- - - - - - - - $2,334 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$2,334
-
$
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,178
Cost:
-
- - - - $2,178 - - - - - -
-
kWh
-
-
kW-months/year
$2,178
-
$
-
-
MMBtu
-
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$888
Cost:
$1,140
- - - - - - $888 180 - - -
-
kWh
-
-
kW-months/year
-
-
$
$888
180
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$46,893
Cost:
$13,254
$28,677 531,297 $8,311 967 $2,178 - $5,393 1,095 $2,334 - $28,677
531,297
kWh
$8,311
967
kW-months/year
$2,178
-
$
$5,393
1,095
MMBtu
$2,334
-
$
TOTAL IMPLEMENTED Savings:
$36,988
Cost:
$6,453
$28,677 531,297 $8,311 967 - - - - - - $28,677
531,297
kWh
$8,311
967
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost