IAC Assessment: WM0105
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2017
Principal Product Treat Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $5,000,000-$10,000,000
# of Employees 14
Plant Area (Sq.Ft.) 435,600
Annual Production 4,740,000 Units
Production Hrs. Annual 8,760
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $302,359 6,142,204 kWh $0.05
Electricity Demand $132,900 12,564 kW-months/year $10.58
Electricity Fees $57,193 - $ -
Natural Gas $23,844 4,733 MMBtu $5.04
TOTAL ENERGY COSTS $516,296
RECOMMENDED SAVINGS* $62,640 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,993
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$25,804
Cost:
$54,545
$19,920 405,223 $5,884 556 - - - - - - $19,920
405,223
kWh
$5,884
556
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$12,974
Cost:
-
$4,230 86,071 $8,744 827 - - - - - - $4,230
86,071
kWh
$8,744
827
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,606
Cost:
$45,000
$9,729 197,955 $2,877 272 - - - - - - $9,729
197,955
kWh
$2,877
272
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$6,920
Cost:
$12,100
- - - - $6,920 - - - - - -
-
kWh
-
-
kW-months/year
$6,920
-
$
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,993
Cost:
$3,400
$2,756 56,068 - - - - - - $237 - $2,756
56,068
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$237
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,053
Cost:
$555
$465 9,474 $588 56 - - - - - - $465
9,474
kWh
$588
56
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$290
Cost:
$1,315
- - - - - - $290 58 - - -
-
kWh
-
-
kW-months/year
-
-
$
$290
58
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$62,640
Cost:
$116,915
$37,100 754,791 $18,093 1,710 $6,920 - $290 58 $237 - $37,100
754,791
kWh
$18,093
1,710
kW-months/year
$6,920
-
$
$290
58
MMBtu
$237
-
$
TOTAL IMPLEMENTED Savings:
$2,993
Cost:
$3,400
$2,756 56,068 - - - - - - $237 - $2,756
56,068
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$237
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes