IAC logo
IAC Assessment: WM0132
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0132
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2019
Principal Product Batter breaded frozen fish
NAICS 311710 - Seafood Product Preparation and Packaging
SIC 2092 - Fresh Or Frozen Prepared Fish
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 31,740
Annual Production 20,000,000 Pounds
Production Hrs. Annual 2,400
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $106,036 1,377,908 kWh $0.08
Electricity Demand $46,284 5,445 kW-months/year $8.50
Electricity Fees $(-1,282) - $ -
Natural Gas $13,352 2,410 MMBtu $5.54
TOTAL ENERGY COSTS $164,390
RECOMMENDED SAVINGS* $30,638 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,647
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$21,662
Cost:
$106,000
$21,662 270,829 - - - - - - $21,662
270,829
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,306
Cost:
$8,640
$2,130 27,675 $1,176 138 - - - - $2,130
27,675
kWh
$1,176
138
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$2,382
Cost:
$12,660
$2,067 26,874 $315 37 - - - - $2,067
26,874
kWh
$315
37
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$992
Cost:
$1,240
$862 11,202 $130 15 - - - - $862
11,202
kWh
$130
15
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$743
Cost:
$1,010
- - - - $743 134 - - -
-
kWh
-
-
kW-months/year
$743
134
MMBtu
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$650
Cost:
$168
$419 5,438 $231 27 - - - - $419
5,438
kWh
$231
27
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$561
Cost:
-
$280 3,641 $281 33 - - - - $280
3,641
kWh
$281
33
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$245
Cost:
$300
$123 1,601 $122 14 - - - - $123
1,601
kWh
$122
14
kW-months/year
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$98
Cost:
$4,120
$64 841 $10 1 - - $24 - $64
841
kWh
$10
1
kW-months/year
-
-
MMBtu
$24
-
$
TOTAL RECOMMENDED Savings:
$30,638
Cost:
$134,138
$27,606 348,101 $2,264 266 $743 134 $24 - $27,606
348,101
kWh
$2,264
266
kW-months/year
$743
134
MMBtu
$24
-
$
TOTAL IMPLEMENTED Savings:
$1,647
Cost:
$5,430
$467 6,083 $412 49 $743 134 $24 - $467
6,083
kWh
$412
49
kW-months/year
$743
134
MMBtu
$24
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost