IAC Assessment: WM0195
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0195
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2023
Principal Product Plastic Sheets
NAICS 326112 - Plastics Packaging Film and Sheet (including Laminated) Manufacturing
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $50,000,000-$100,000,000
# of Employees 125
Plant Area (Sq.Ft.) 185,600
Annual Production 34,694,588 Pounds
Production Hrs. Annual 8,112
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $697,217 11,271,600 kWh $0.06
Electricity Demand $253,485 23,580 kW-months/year $10.75
Electricity Fees $76,812 - $ -
Natural Gas $197,942 24,710 MMBtu $8.01
TOTAL ENERGY COSTS $1,225,456
RECOMMENDED SAVINGS* $50,574 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,776
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,725
Cost:
$13,127
$13,493 217,622 $2,233 208 - - - - - - $13,493
217,622
kWh
$2,233
208
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$15,091
Cost:
$13,400
- - - - $15,091 1,884 - - - - -
-
kWh
-
-
kW-months/year
$15,091
1,884
MMBtu
-
-
$
-
-
$
03: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$5,128
Cost:
$1,700
$4,081 65,826 $1,047 97 - - - - - - $4,081
65,826
kWh
$1,047
97
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,436
Cost:
$3,735
- - - - - - $4,436 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,436
-
$
-
-
$
05: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$2,687
Cost:
-
- - - - - - - - $2,687 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$2,687
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,381
Cost:
$700
$2,110 34,040 $271 25 - - - - - - $2,110
34,040
kWh
$271
25
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,997
Cost:
$1,000
$1,730 27,903 $267 25 - - - - - - $1,730
27,903
kWh
$267
25
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.7212 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS Savings:
$1,986
Cost:
$2,700
- - - - $1,986 248 - - - - -
-
kWh
-
-
kW-months/year
$1,986
248
MMBtu
-
-
$
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,142
Cost:
$1,715
$1,012 16,329 $130 12 - - - - - - $1,012
16,329
kWh
$130
12
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$50,574
Cost:
$38,077
$22,427 361,720 $3,947 367 $17,077 2,132 $4,436 - $2,687 - $22,427
361,720
kWh
$3,947
367
kW-months/year
$17,077
2,132
MMBtu
$4,436
-
$
$2,687
-
$
TOTAL IMPLEMENTED Savings:
$24,776
Cost:
$17,527
$17,333 279,565 $2,770 258 $1,986 248 - - $2,687 - $17,333
279,565
kWh
$2,770
258
kW-months/year
$1,986
248
MMBtu
-
-
$
$2,687
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes One-time Revenue or Avoided Cost