IAC logo
IAC Assessment: WV0008
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0008
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1993
Principal Product Signage in Bronze
NAICS n/a
SIC 3369 - Nonferrous Foundries, Nec
Sales $10,000,000-$50,000,000
# of Employees 156
Plant Area (Sq.Ft.) 63,500
Annual Production 0 Units
Production Hrs. Annual 2,080
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $295,533 4,597,304 kWh $0.06
Natural Gas $50,268 9,989 MMBtu $5.03
TOTAL ENERGY COSTS $345,801
RECOMMENDED SAVINGS* $21,741 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,039
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,872
Cost:
$1,600
- - $1,872 374 -
-
kWh
$1,872
374
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$966
Cost:
$582
$966 35,756 - - $966
35,756
kWh
-
-
MMBtu
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,773
Cost:
$598
- - $1,773 353 -
-
kWh
$1,773
353
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$419
Cost:
$576
$419 15,533 - - $419
15,533
kWh
-
-
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$100
Cost:
$7,275
$100 3,810 - - $100
3,810
kWh
-
-
MMBtu
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$285
Cost:
-
- - $285 51 -
-
kWh
$285
51
MMBtu
07: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$12,781
Cost:
$408
- - $12,781 2,541 -
-
kWh
$12,781
2,541
MMBtu
08: 2.2525 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA Savings:
$2,138
Cost:
$2,057
$2,138 79,132 - - $2,138
79,132
kWh
-
-
MMBtu
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,407
Cost:
$682
- - $1,407 177 -
-
kWh
$1,407
177
MMBtu
TOTAL RECOMMENDED Savings:
$21,741
Cost:
$13,778
$3,623 134,231 $18,118 3,496 $3,623
134,231
kWh
$18,118
3,496
MMBtu
TOTAL IMPLEMENTED Savings:
$16,039
Cost:
$9,439
$1,485 55,099 $14,554 2,894 $1,485
55,099
kWh
$14,554
2,894
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas