IAC Assessment: WV0011
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0011
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1993
Principal Product Aluminum Rolled Products
NAICS n/a
SIC 3313 - Electrometallurgical Products
Sales $10,000,000-$50,000,000
# of Employees 220
Plant Area (Sq.Ft.) 277,000
Annual Production 0 Units
Production Hrs. Annual 8,736
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $924,750 23,034,877 kWh $0.04
Natural Gas $349,438 79,390 MMBtu $4.40
TOTAL ENERGY COSTS $1,274,188
RECOMMENDED SAVINGS* $110,481 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $62,127
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,345
Cost:
$2,613
- - $2,345 606 -
-
kWh
$2,345
606
MMBtu
02: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$18,346
Cost:
$6,950
- - $18,346 4,753 -
-
kWh
$18,346
4,753
MMBtu
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$5,265
Cost:
$4,110
$5,265 257,327 - - $5,265
257,327
kWh
-
-
MMBtu
04: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$27,112
Cost:
$1,450
- - $27,112 7,024 -
-
kWh
$27,112
7,024
MMBtu
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$51,421
Cost:
$28,120
$51,421 - - - $51,421
-
kWh
-
-
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$551
Cost:
$247
- - $551 143 -
-
kWh
$551
143
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,643
Cost:
$3,362
$1,643 75,909 - - $1,643
75,909
kWh
-
-
MMBtu
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,798
Cost:
$12,730
$3,798 175,264 - - $3,798
175,264
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$110,481
Cost:
$59,582
$62,127 508,500 $48,354 12,526 $62,127
508,500
kWh
$48,354
12,526
MMBtu
TOTAL IMPLEMENTED Savings:
$62,127
Cost:
$48,322
$62,127 508,500 - - $62,127
508,500
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas