IAC logo
IAC Assessment: WV0084
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0084
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1996
Principal Product Glass giftware
NAICS n/a
SIC 3229 - Pressed And Blown Glass, Nec
Sales $10,000,000-$50,000,000
# of Employees 435
Plant Area (Sq.Ft.) 290,000
Annual Production 7,000,000 Pounds
Production Hrs. Annual 4,000
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $129,667 4,579,719 kWh $0.03
Electricity Demand $95,110 10,671 kW-months/year $8.91
Electricity Fees $8,490 - $ -
Natural Gas $871,856 411,026 MMBtu $2.12
TOTAL ENERGY COSTS $1,105,123
RECOMMENDED SAVINGS* $15,328 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,852
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,160
Cost:
$800
$1,160 41,032 - - - - - - - - $1,160
41,032
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$570
Cost:
$10,840
$570 19,930 - - - - - - - - $570
19,930
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$746
Cost:
$2,000
$746 26,377 - - - - - - - - $746
26,377
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$480
Cost:
$275
$480 16,999 - - - - - - - - $480
16,999
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$907
Cost:
$40
$907 14,947 - - - - - - - - $907
14,947
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$6,138
Cost:
-
- - $6,138 756 - - - - - - -
-
kWh
$6,138
756
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$638
Cost:
$1,000
- - - - $638 301 - - - - -
-
kWh
-
-
kW-months/year
$638
301
MMBtu
-
-
Tgal
-
-
$
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$646
Cost:
$1,450
- - - - $646 305 - - - - -
-
kWh
-
-
kW-months/year
$646
305
MMBtu
-
-
Tgal
-
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$331
Cost:
$453
- - - - $331 156 - - - - -
-
kWh
-
-
kW-months/year
$331
156
MMBtu
-
-
Tgal
-
-
$
10: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$3,712
Cost:
$5,120
$(-28) (-1,172) - - - - $4,000 1,000,000 $(-260) - $(-28)
(-1,172)
kWh
-
-
kW-months/year
-
-
MMBtu
$4,000
1,000,000
Tgal
$(-260)
-
$
TOTAL RECOMMENDED Savings:
$15,328
Cost:
$21,978
$3,835 118,113 $6,138 756 $1,615 762 $4,000 1,000,000 $(-260) - $3,835
118,113
kWh
$6,138
756
kW-months/year
$1,615
762
MMBtu
$4,000
1,000,000
Tgal
$(-260)
-
$
TOTAL IMPLEMENTED Savings:
$9,852
Cost:
$14,133
$3,383 102,286 $6,138 756 $331 156 - - - - $3,383
102,286
kWh
$6,138
756
kW-months/year
$331
156
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost