IAC logo
IAC Assessment: WV0091
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0091
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1996
Principal Product Lumber Products
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 45,000
Annual Production 13,000 Thousand Feet
Production Hrs. Annual 4,335
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $159,845 2,528,429 kWh $0.06
Electricity Fees $378 - $ -
Natural Gas $39,180 7,261 MMBtu $5.40
TOTAL ENERGY COSTS $199,403
RECOMMENDED SAVINGS* $26,047 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,183
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$61
Cost:
$43
$61 1,465 - - - - $61
1,465
kWh
-
-
MMBtu
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$833
Cost:
$3,726
$833 19,343 - - - - $833
19,343
kWh
-
-
MMBtu
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,048
Cost:
$3,200
$5,048 117,233 - - - - $5,048
117,233
kWh
-
-
MMBtu
-
-
$
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$10,600
Cost:
$16,000
$10,600 246,483 - - - - $10,600
246,483
kWh
-
-
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$84
Cost:
$210
$84 1,758 - - - - $84
1,758
kWh
-
-
MMBtu
-
-
$
06: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$357
Cost:
$350
$357 11,723 - - - - $357
11,723
kWh
-
-
MMBtu
-
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$264
Cost:
$220
- - $264 49 - - -
-
kWh
$264
49
MMBtu
-
-
$
08: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$8,800
Cost:
-
- - - - $8,800 - -
-
kWh
-
-
MMBtu
$8,800
-
$
TOTAL RECOMMENDED Savings:
$26,047
Cost:
$23,749
$16,983 398,005 $264 49 $8,800 - $16,983
398,005
kWh
$264
49
MMBtu
$8,800
-
$
TOTAL IMPLEMENTED Savings:
$15,183
Cost:
$7,529
$6,383 151,522 - - $8,800 - $6,383
151,522
kWh
-
-
MMBtu
$8,800
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes