Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 1996 |
Principal Product | Travel Trailers |
NAICS | n/a |
SIC | 3792 - Travel Trailers And Campers |
Sales | $10,000,000-$50,000,000 |
# of Employees | 320 |
Plant Area (Sq.Ft.) | 120,000 |
Annual Production | 0 Units |
Production Hrs. Annual | 2,210 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $47,409 | 1,249,414 | kWh | $0.04 |
Electricity Demand | $36,711 | 4,957 | kW-months/year | $7.41 |
Electricity Fees | $3,763 | - | $ | - |
Natural Gas | $40,778 | 5,431 | MMBtu | $7.51 |
TOTAL ENERGY COSTS | $128,661 | |||
RECOMMENDED SAVINGS* | $9,156 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,953 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $973 Cost: $246 |
$92 | 2,638 | $881 | 48 | - | - | - | - |
$92 2,638 kWh |
$881 48 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,968 Cost: $1,359 |
$132 | 3,517 | $1,836 | 100 | - | - | - | - |
$132 3,517 kWh |
$1,836 100 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $40 Cost: $40 |
$40 | 879 | - | - | - | - | - | - |
$40 879 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $240 Cost: $325 |
$240 | 6,448 | - | - | - | - | - | - |
$240 6,448 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $357 Cost: $132 |
$357 | 9,965 | - | - | - | - | - | - |
$357 9,965 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,365 Cost: $1,295 |
$1,365 | 38,101 | - | - | - | - | - | - |
$1,365 38,101 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $1,163 Cost: $2,440 |
$1,163 | 32,532 | - | - | - | - | - | - |
$1,163 32,532 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,046 Cost: $1,688 |
- | - | - | - | $1,046 | 139 | - | - |
- - kWh |
- - kW-months/year |
$1,046 139 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $684 Cost: - |
$58 | 1,758 | - | - | $626 | 83 | - | - |
$58 1,758 kWh |
- - kW-months/year |
$626 83 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS |
Savings: $1,320 Cost: $100 |
- | - | - | - | - | - | $1,320 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,320 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $9,156 Cost: $7,625 |
$3,447 | 95,838 | $2,717 | 148 | $1,672 | 222 | $1,320 | - | $3,447 95,838 kWh |
$2,717 148 kW-months/year |
$1,672 222 MMBtu |
$1,320 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,953 Cost: $5,145 |
$2,244 | 62,427 | $2,717 | 148 | $1,672 | 222 | $1,320 | - | $2,244 62,427 kWh |
$2,717 148 kW-months/year |
$1,672 222 MMBtu |
$1,320 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes |