IAC logo
IAC Assessment: WV0103
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0103
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1996
Principal Product Air Conditioners and Dehumidifiers
NAICS n/a
SIC 3585 - Refrigeration And Heating Equipment
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 120,000
Annual Production 1,500 Pieces
Production Hrs. Annual 2,210
Location (State) MD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $43,344 1,649,179 kWh $0.03
Electricity Demand $54,461 6,248 kW-months/year $8.72
Electricity Fees $28,677 - $ -
Natural Gas $53,218 8,380 MMBtu $6.35
TOTAL ENERGY COSTS $179,700
RECOMMENDED SAVINGS* $10,795 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,825
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,942
Cost:
$1,562
$226 7,913 $1,716 152 - - - - - - $226
7,913
kWh
$1,716
152
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$151
Cost:
$162
$15 586 $136 12 - - - - - - $15
586
kWh
$136
12
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$65
Cost:
$35
$65 2,345 - - - - - - - - $65
2,345
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$735
Cost:
$2,010
$735 26,084 - - - - - - - - $735
26,084
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$343
Cost:
$522
- - - - $343 54 - - - - -
-
kWh
-
-
kW-months/year
$343
54
MMBtu
-
-
$
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,667
Cost:
$2,000
- - - - $2,667 420 - - - - -
-
kWh
-
-
kW-months/year
$2,667
420
MMBtu
-
-
$
-
-
$
07: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$1,065
Cost:
$3,500
- - - - $1,065 167 - - - - -
-
kWh
-
-
kW-months/year
$1,065
167
MMBtu
-
-
$
-
-
$
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$3,827
Cost:
$10,000
$(-8) (-293) - - - - $(-425) - $4,260 - $(-8)
(-293)
kWh
-
-
kW-months/year
-
-
MMBtu
$(-425)
-
$
$4,260
-
$
TOTAL RECOMMENDED Savings:
$10,795
Cost:
$19,791
$1,033 36,635 $1,852 164 $4,075 641 $(-425) - $4,260 - $1,033
36,635
kWh
$1,852
164
kW-months/year
$4,075
641
MMBtu
$(-425)
-
$
$4,260
-
$
TOTAL IMPLEMENTED Savings:
$4,825
Cost:
$3,759
$306 10,844 $1,852 164 $2,667 420 - - - - $306
10,844
kWh
$1,852
164
kW-months/year
$2,667
420
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes