Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 1997 |
Principal Product | Refractories |
NAICS | n/a |
SIC | 3259 - Structural Clay Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 125 |
Plant Area (Sq.Ft.) | 61,000 |
Annual Production | 250,000 Pieces |
Production Hrs. Annual | 2,125 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $83,136 | 2,131,594 | kWh | $0.04 |
Electricity Demand | $113,164 | 6,347 | kW-months/year | $17.83 |
Electricity Fees | $(-5,828) | - | $ | - |
Natural Gas | $274,825 | 149,151 | MMBtu | $1.84 |
TOTAL ENERGY COSTS | $493,297 | |||
RECOMMENDED SAVINGS* | $143,885 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $108,935 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Primary Product | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Primary Product | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,294 Cost: $393 |
$542 | 6,741 | $3,752 | 202 | - | - | - | - | - | - | - | - | - | - | - | - |
$542 6,741 kWh |
$3,752 202 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $4,115 Cost: $3,045 |
$405 | 9,965 | $3,710 | 200 | - | - | - | - | - | - | - | - | - | - | - | - |
$405 9,965 kWh |
$3,710 200 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $36 Cost: $235 |
$36 | 879 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$36 879 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $3,631 Cost: $1,200 |
$1,049 | 25,791 | $2,582 | 139 | - | - | - | - | - | - | - | - | - | - | - | - |
$1,049 25,791 kWh |
$2,582 139 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR |
Savings: $26,407 Cost: $50,000 |
$14,041 | 344,959 | $12,366 | 1,947 | - | - | - | - | - | - | - | - | - | - | - | - |
$14,041 344,959 kWh |
$12,366 1,947 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7225 CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS |
Savings: $307 Cost: $705 |
- | - | - | - | $307 | 167 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$307 167 MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $7,000 Cost: $10,000 |
- | - | - | - | - | - | $9,800 | 10,500 | $(-2,800) | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$9,800 10,500 lb |
$(-2,800) - $ |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $6,000 Cost: $200 |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | $6,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
$6,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $54,000 Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | $54,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
$54,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.511 EXPAND OPERATIONS INTO UNUSED SPACE |
Savings: $1,200 Cost: $1,814 |
- | - | - | - | - | - | - | - | - | - | - | - | $1,200 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
$1,200 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.1172 REVISE RAW MATERIAL SPECS |
Savings: $36,895 Cost: $4,293 |
- | - | - | - | - | - | - | - | - | - | $36,895 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$36,895 - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $143,885 Cost: $71,885 |
$16,073 | 388,335 | $22,410 | 2,488 | $307 | 167 | $9,800 | 10,500 | $(-2,800) | - | $36,895 | - | $1,200 | - | $60,000 | - | $16,073 388,335 kWh |
$22,410 2,488 kW-months/year |
$307 167 MMBtu |
$9,800 10,500 lb |
$(-2,800) - $ |
$36,895 - $ |
$1,200 - $ |
$60,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $108,935 Cost: $9,131 |
$1,996 | 42,497 | $10,044 | 541 | - | - | - | - | - | - | $36,895 | - | - | - | $60,000 | - | $1,996 42,497 kWh |
$10,044 541 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$36,895 - $ |
- - $ |
$60,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Primary Product | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Primary Product | By-product Production |