IAC logo
IAC Assessment: WV0120
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0120
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1997
Principal Product Petroleum Coke
NAICS n/a
SIC 3624 - Carbon And Graphite Products
Sales $10,000,000-$50,000,000
# of Employees 72
Plant Area (Sq.Ft.) 200,000
Annual Production 440,000 Tons
Production Hrs. Annual 8,652
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $635,168 14,112,837 kWh $0.05
Natural Gas $1,005,372 402,148 MMBtu $2.50
TOTAL ENERGY COSTS $1,640,540
RECOMMENDED SAVINGS* $1,467,031 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,874
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Natural Gas Administrative Changes Primary Raw Material Ancillary Material Cost
$ kWh $ MMBtu $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$163
Cost:
$248
$163 3,517 - - - - - - - - $163
3,517
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,350
Cost:
$14,800
$4,350 96,717 - - - - - - - - $4,350
96,717
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$7,241
Cost:
$3,680
$7,241 160,903 - - - - - - - - $7,241
160,903
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$3,588
Cost:
$1,275
$3,588 79,719 - - - - - - - - $3,588
79,719
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,648
Cost:
$50
$6,648 147,714 - - - - - - - - $6,648
147,714
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$449,333
Cost:
$600,000
$484,333 10,764,947 - - $(-35,000) - - - - - $484,333
10,764,947
kWh
-
-
MMBtu
$(-35,000)
-
$
-
-
$
-
-
$
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$12,375
Cost:
$20,800
- - $12,375 4,950 - - - - - - -
-
kWh
$12,375
4,950
MMBtu
-
-
$
-
-
$
-
-
$
08: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$120
Cost:
$100
- - - - - - - - $120 - -
-
kWh
-
-
MMBtu
-
-
$
-
-
$
$120
-
$
09: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$983,213
Cost:
$100,000
- - - - - - $983,213 - - - -
-
kWh
-
-
MMBtu
-
-
$
$983,213
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$1,467,031
Cost:
$740,953
$506,323 11,253,517 $12,375 4,950 $(-35,000) - $983,213 - $120 - $506,323
11,253,517
kWh
$12,375
4,950
MMBtu
$(-35,000)
-
$
$983,213
-
$
$120
-
$
TOTAL IMPLEMENTED Savings:
$11,874
Cost:
$18,828
$11,754 261,137 - - - - - - $120 - $11,754
261,137
kWh
-
-
MMBtu
-
-
$
-
-
$
$120
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $ $ $
Electricity Usage Natural Gas Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Natural Gas Administrative Changes Primary Raw Material Ancillary Material Cost