IAC logo
IAC Assessment: WV0130
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0130
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1997
Principal Product Confectioneries
NAICS n/a
SIC 2064 - Candy & Other Confectionery Products
Sales $1,000,000-$5,000,000
# of Employees 35
Plant Area (Sq.Ft.) 30,000
Annual Production 0 Units
Production Hrs. Annual 5,880
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $32,382 805,979 kWh $0.04
Electricity Demand $41,830 2,325 kW-months/year $17.99
Electricity Fees $(-3,339) - $ -
Natural Gas $7,672 1,366 MMBtu $5.62
TOTAL ENERGY COSTS $83,699
RECOMMENDED SAVINGS* $61,588 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $48,817
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,013
Cost:
$235
$506 14,068 $507 48 - - - - - - - - - - $506
14,068
kWh
$507
48
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$184
Cost:
$249
$46 1,172 $138 13 - - - - - - - - - - $46
1,172
kWh
$138
13
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$391
Cost:
$680
$391 10,844 - - - - - - - - - - - - $391
10,844
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$107
Cost:
$110
$107 2,931 - - - - - - - - - - - - $107
2,931
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$107
Cost:
$80
$107 2,931 - - - - - - - - - - - - $107
2,931
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
06: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$7,634
Cost:
$5,160
$7,634 211,899 - - - - - - - - - - - - $7,634
211,899
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$90
Cost:
$400
- - - - $90 16 - - - - - - - - -
-
kWh
-
-
kW-months/year
$90
16
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
08: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$1,234
Cost:
$250
- - - - $1,234 220 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,234
220
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$82
Cost:
$33
- - - - $82 15 - - - - - - - - -
-
kWh
-
-
kW-months/year
$82
15
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
10: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$507
Cost:
$225
- - - - $507 90 - - - - - - - - -
-
kWh
-
-
kW-months/year
$507
90
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
11: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$1,512
Cost:
$2,300
- - - - - - $1,512 220,000 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,512
220,000
Tgal
-
-
$
-
-
$
-
-
$
12: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$1,687
Cost:
$11,000
$(-26) (-879) - - - - - - $(-367) - $2,080 - - - $(-26)
(-879)
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-367)
-
$
$2,080
-
$
-
-
$
13: 4.432 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$47,040
Cost:
-
- - - - - - - - - - - - $47,040 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
$47,040
-
$
TOTAL RECOMMENDED Savings:
$61,588
Cost:
$20,722
$8,765 242,966 $645 61 $1,913 341 $1,512 220,000 $(-367) - $2,080 - $47,040 - $8,765
242,966
kWh
$645
61
kW-months/year
$1,913
341
MMBtu
$1,512
220,000
Tgal
$(-367)
-
$
$2,080
-
$
$47,040
-
$
TOTAL IMPLEMENTED Savings:
$48,817
Cost:
$1,277
$1,050 29,015 $645 61 $82 15 - - - - - - $47,040 - $1,050
29,015
kWh
$645
61
kW-months/year
$82
15
MMBtu
-
-
Tgal
-
-
$
-
-
$
$47,040
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Administrative Changes Primary Product