IAC logo
IAC Assessment: WV0138
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0138
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1998
Principal Product Wood Furniture
NAICS n/a
SIC 2511 - Wood Household Furniture
Sales $5,000,000-$10,000,000
# of Employees 95
Plant Area (Sq.Ft.) 185,000
Annual Production 600 Thousand Feet
Production Hrs. Annual 2,168
Location (State) MD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $100,459 1,690,797 kWh $0.06
Natural Gas $35,832 5,182 MMBtu $6.91
TOTAL ENERGY COSTS $136,291
RECOMMENDED SAVINGS* $71,646 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,475
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ MMBtu $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$564
Cost:
$2,195
$564 9,965 - - - - - - $564
9,965
kWh
-
-
MMBtu
-
-
lb
-
-
$
02: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$343
Cost:
$254
$343 5,862 - - - - - - $343
5,862
kWh
-
-
MMBtu
-
-
lb
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$865
Cost:
$324
- - $865 125 - - - - -
-
kWh
$865
125
MMBtu
-
-
lb
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$186
Cost:
$112
$186 3,224 - - - - - - $186
3,224
kWh
-
-
MMBtu
-
-
lb
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$515
Cost:
$240
$515 8,792 - - - - - - $515
8,792
kWh
-
-
MMBtu
-
-
lb
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$900
Cost:
$3,830
$900 14,947 - - - - - - $900
14,947
kWh
-
-
MMBtu
-
-
lb
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,520
Cost:
$380
- - $4,520 260 - - - - -
-
kWh
$4,520
260
MMBtu
-
-
lb
-
-
$
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$2,724
Cost:
-
- - - - - - $2,724 - -
-
kWh
-
-
MMBtu
-
-
lb
$2,724
-
$
09: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$3,429
Cost:
-
- - - - $3,429 - - - -
-
kWh
-
-
MMBtu
$3,429
-
lb
-
-
$
10: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$57,600
Cost:
$272
- - - - $57,600 - - - -
-
kWh
-
-
MMBtu
$57,600
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$71,646
Cost:
$7,607
$2,508 42,790 $5,385 385 $61,029 - $2,724 - $2,508
42,790
kWh
$5,385
385
MMBtu
$61,029
-
lb
$2,724
-
$
TOTAL IMPLEMENTED Savings:
$8,475
Cost:
$6,519
$2,322 39,566 - - $3,429 - $2,724 - $2,322
39,566
kWh
-
-
MMBtu
$3,429
-
lb
$2,724
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes