Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 1998 |
Principal Product | Convex tempered &etched glass |
NAICS | n/a |
SIC | 3231 - Products Of Purchased Glass |
Sales | $5,000,000-$10,000,000 |
# of Employees | 55 |
Plant Area (Sq.Ft.) | 89,462 |
Annual Production | 1,000 Thousand Feet |
Production Hrs. Annual | 1,880 |
Location (State) | WV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $60,448 | 1,037,515 | kWh | $0.06 |
Natural Gas | $119,977 | 35,279 | MMBtu | $3.40 |
TOTAL ENERGY COSTS | $180,425 | |||
RECOMMENDED SAVINGS* | $89,809 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $8,937 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7314 REDUCE VENTILATION AIR |
Savings: $314 Cost: $350 |
- | - | $314 | 92 | - | - | - | - | - | - |
- - kWh |
$314 92 MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $38 Cost: $136 |
$38 | 586 | - | - | - | - | - | - | - | - |
$38 586 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM |
Savings: $2,135 Cost: $1,000 |
- | - | $2,135 | 628 | - | - | - | - | - | - |
- - kWh |
$2,135 628 MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $408 Cost: $3,072 |
- | - | $408 | 120 | - | - | - | - | - | - |
- - kWh |
$408 120 MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $87 Cost: $217 |
$87 | 1,465 | - | - | - | - | - | - | - | - |
$87 1,465 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $506 Cost: $263 |
- | - | $506 | 149 | - | - | - | - | - | - |
- - kWh |
$506 149 MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $18,084 Cost: $2,893 |
- | - | $18,084 | 5,319 | - | - | - | - | - | - |
- - kWh |
$18,084 5,319 MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2514 COVER OPEN TANKS |
Savings: $4,417 Cost: $699 |
- | - | $4,417 | 1,315 | - | - | - | - | - | - |
- - kWh |
$4,417 1,315 MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $136 Cost: $1,439 |
$136 | 2,345 | - | - | - | - | - | - | - | - |
$136 2,345 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.8123 PAY UTILITY BILLS ON TIME |
Savings: $657 Cost: - |
- | - | - | - | - | - | - | - | $657 | - |
- - kWh |
- - MMBtu |
- - Tgal |
- - lb |
$657 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS |
Savings: $783 Cost: $850 |
- | - | - | - | $783 | - | - | - | - | - |
- - kWh |
- - MMBtu |
$783 - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $5,004 Cost: $11,000 |
- | - | - | - | - | - | $5,004 | - | - | - |
- - kWh |
- - MMBtu |
- - Tgal |
$5,004 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 4.521 CLEAR AND RENT EXISTING SPACE |
Savings: $57,240 Cost: $16,800 |
- | - | - | - | - | - | - | - | $57,240 | - |
- - kWh |
- - MMBtu |
- - Tgal |
- - lb |
$57,240 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $89,809 Cost: $38,719 |
$261 | 4,396 | $25,864 | 7,623 | $783 | - | $5,004 | - | $57,897 | - | $261 4,396 kWh |
$25,864 7,623 MMBtu |
$783 - Tgal |
$5,004 - lb |
$57,897 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $8,937 Cost: $7,627 |
$223 | 3,810 | $7,274 | 2,155 | $783 | - | - | - | $657 | - | $223 3,810 kWh |
$7,274 2,155 MMBtu |
$783 - Tgal |
- - lb |
$657 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes |