Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 1998 |
Principal Product | Hardwood Caskets |
NAICS | n/a |
SIC | 3995 - Burial Caskets |
Sales | $10,000,000-$50,000,000 |
# of Employees | 141 |
Plant Area (Sq.Ft.) | 291,600 |
Annual Production | 22,100 Pieces |
Production Hrs. Annual | 5,200 |
Location (State) | WV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $224,487 | 4,305,100 | kWh | $0.05 |
Natural Gas | $17,589 | 1,686 | MMBtu | $10.43 |
TOTAL ENERGY COSTS | $242,076 | |||
RECOMMENDED SAVINGS* | $154,015 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $31,043 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $2,607 Cost: $1,160 |
- | - | $2,607 | 250 | - | - | - | - | - | - |
- - kWh |
$2,607 250 MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $298 Cost: $116 |
$298 | 5,569 | - | - | - | - | - | - | - | - |
$298 5,569 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $372 Cost: $89 |
- | - | $372 | 36 | - | - | - | - | - | - |
- - kWh |
$372 36 MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $164 Cost: $40 |
$164 | 2,931 | - | - | - | - | - | - | - | - |
$164 2,931 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,372 Cost: $1,602 |
$1,372 | 127,198 | - | - | - | - | - | - | - | - |
$1,372 127,198 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL |
Savings: $3,468 Cost: $3,600 |
- | - | - | - | - | - | $3,468 | - | - | - |
- - kWh |
- - MMBtu |
- - lb |
$3,468 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $7,036 Cost: $7,700 |
- | - | $7,036 | 609 | - | - | - | - | - | - |
- - kWh |
$7,036 609 MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $10,304 Cost: $3,700 |
- | - | $10,304 | 998 | - | - | - | - | - | - |
- - kWh |
$10,304 998 MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,574 Cost: $360 |
$1,574 | 30,188 | - | - | - | - | - | - | - | - |
$1,574 30,188 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7122 DISCONNECT BALLASTS |
Savings: $620 Cost: $1,024 |
$620 | 12,016 | - | - | - | - | - | - | - | - |
$620 12,016 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.8123 PAY UTILITY BILLS ON TIME |
Savings: $4,142 Cost: - |
- | - | - | - | - | - | $4,142 | - | - | - |
- - kWh |
- - MMBtu |
- - lb |
$4,142 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER |
Savings: $10,419 Cost: - |
- | - | - | - | - | - | $10,419 | - | - | - |
- - kWh |
- - MMBtu |
- - lb |
$10,419 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $10,895 Cost: $880 |
$10,895 | 208,968 | - | - | - | - | - | - | - | - |
$10,895 208,968 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS |
Savings: $1,600 Cost: $288 |
- | - | - | - | $1,600 | - | - | - | - | - |
- - kWh |
- - MMBtu |
$1,600 - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $5,807 Cost: $301 |
- | - | - | - | $5,807 | - | - | - | - | - |
- - kWh |
- - MMBtu |
$5,807 - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST |
Savings: $93,337 Cost: $16,128 |
- | - | - | - | - | - | - | - | $93,337 | - |
- - kWh |
- - MMBtu |
- - lb |
- - $ |
$93,337 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $154,015 Cost: $36,988 |
$14,923 | 386,870 | $20,319 | 1,893 | $7,407 | - | $18,029 | - | $93,337 | - | $14,923 386,870 kWh |
$20,319 1,893 MMBtu |
$7,407 - lb |
$18,029 - $ |
$93,337 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $31,043 Cost: $7,983 |
$14,625 | 381,301 | $10,676 | 1,034 | $1,600 | - | $4,142 | - | - | - | $14,625 381,301 kWh |
$10,676 1,034 MMBtu |
$1,600 - lb |
$4,142 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost |