Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 1999 |
Principal Product | Boxes(PVC, Fiberglass, Steel) |
NAICS | n/a |
SIC | 3613 - Switchgear And Switchboard Apparatus |
Sales | $10,000,000-$50,000,000 |
# of Employees | 147 |
Plant Area (Sq.Ft.) | 300,000 |
Annual Production | 6,000,000 Pieces |
Production Hrs. Annual | 8,496 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $299,238 | 5,897,421 | kWh | $0.05 |
Electricity Demand | $67,167 | 13,554 | kW-months/year | $4.96 |
Electricity Fees | $3,849 | - | $ | - |
Natural Gas | $60,612 | 20,616 | MMBtu | $2.94 |
TOTAL ENERGY COSTS | $430,866 | |||
RECOMMENDED SAVINGS* | $117,797 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $20,378 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Solid Waste (haz) | Administrative Changes | Primary Product | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Solid Waste (haz) | Administrative Changes | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $17,572 Cost: $15,591 |
$17,572 | 446,659 | - | - | - | - | - | - | - | - | - | - | - | - |
$17,572 446,659 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM |
Savings: $1,158 Cost: $672 |
- | - | $1,158 | 394 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$1,158 394 MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL |
Savings: $4,324 Cost: $4,800 |
- | - | - | - | - | - | - | - | - | - | $4,324 | - | - | - |
- - kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
$4,324 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $7,399 Cost: $1,876 |
$7,399 | 163,834 | - | - | - | - | - | - | - | - | - | - | - | - |
$7,399 163,834 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $732 Cost: $671 |
$732 | 5,569 | - | - | - | - | - | - | - | - | - | - | - | - |
$732 5,569 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,548 Cost: $144 |
$2,548 | 64,771 | - | - | - | - | - | - | - | - | - | - | - | - |
$2,548 64,771 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,743 Cost: $60 |
$1,743 | 44,256 | - | - | - | - | - | - | - | - | - | - | - | - |
$1,743 44,256 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $6,888 Cost: $4,000 |
- | - | $6,888 | 2,390 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$6,888 2,390 MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1224 REPLACE BOILER |
Savings: $2,866 Cost: $49,515 |
- | - | $2,866 | 975 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$2,866 975 MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $5,638 Cost: $23 |
$5,638 | 143,318 | - | - | - | - | - | - | - | - | - | - | - | - |
$5,638 143,318 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $4,852 Cost: $3,756 |
- | - | - | - | $4,852 | - | - | - | - | - | - | - | - | - |
- - kWh |
- - MMBtu |
$4,852 - Tgal |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS |
Savings: $560 Cost: - |
- | - | - | - | - | - | - | - | $560 | - | - | - | - | - |
- - kWh |
- - MMBtu |
- - Tgal |
- - lb |
$560 - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS |
Savings: $600 Cost: $42 |
- | - | - | - | - | - | $600 | - | - | - | - | - | - | - |
- - kWh |
- - MMBtu |
- - Tgal |
$600 - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 4.423 MOVE PRODUCT USING MECHANICAL MEANS |
Savings: $4,667 Cost: $260 |
- | - | - | - | - | - | - | - | - | - | - | - | $4,667 | - |
- - kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
- - $ |
$4,667 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 4.521 CLEAR AND RENT EXISTING SPACE |
Savings: $56,250 Cost: $4,800 |
- | - | - | - | - | - | - | - | - | - | $56,250 | - | - | - |
- - kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - lb |
$56,250 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $117,797 Cost: $86,210 |
$35,632 | 868,407 | $10,912 | 3,759 | $4,852 | - | $600 | - | $560 | - | $60,574 | - | $4,667 | - | $35,632 868,407 kWh |
$10,912 3,759 MMBtu |
$4,852 - Tgal |
$600 - lb |
$560 - lb |
$60,574 - $ |
$4,667 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $20,378 Cost: $3,488 |
$18,060 | 421,748 | $1,158 | 394 | - | - | $600 | - | $560 | - | - | - | - | - | $18,060 421,748 kWh |
$1,158 394 MMBtu |
- - Tgal |
$600 - lb |
$560 - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Solid Waste (haz) | Administrative Changes | Primary Product | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Solid Waste (haz) | Administrative Changes | Primary Product |