IAC logo
IAC Assessment: WV0160
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0160
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1999
Principal Product Rubber molds and machine parts
NAICS n/a
SIC 3544 - Special Dies, Tools, Jigs & Fixtures
Sales $10,000,000-$50,000,000
# of Employees 97
Plant Area (Sq.Ft.) 80,000
Annual Production 0 Units
Production Hrs. Annual 7,280
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $150,971 2,488,863 kWh $0.06
Natural Gas $14,840 2,697 MMBtu $5.50
TOTAL ENERGY COSTS $165,811
RECOMMENDED SAVINGS* $218,483 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $182,661
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Solid Waste (haz) Administrative Changes
$ kWh $ MMBtu $ Tgal $ lb $ lb $ $
01: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$1,892
Cost:
$480
- - $1,892 296 - - - - - - - - -
-
kWh
$1,892
296
MMBtu
-
-
Tgal
-
-
lb
-
-
lb
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$391
Cost:
$212
$391 6,448 - - - - - - - - - - $391
6,448
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
lb
-
-
$
03: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$2,058
Cost:
$1,200
- - - - - - - - - - $2,058 - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
lb
$2,058
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,689
Cost:
$15
$1,689 27,843 - - - - - - - - - - $1,689
27,843
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
lb
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$142
Cost:
-
$142 2,345 - - - - - - - - - - $142
2,345
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
lb
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$830
Cost:
$130
$830 13,775 - - - - - - - - - - $830
13,775
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
lb
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$333
Cost:
$214
- - $333 6 - - - - - - - - -
-
kWh
$333
6
MMBtu
-
-
Tgal
-
-
lb
-
-
lb
-
-
$
08: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$25,624
Cost:
$16,640
$46,584 767,878 $(-20,960) (-3,275) - - - - - - - - $46,584
767,878
kWh
$(-20,960)
(-3,275)
MMBtu
-
-
Tgal
-
-
lb
-
-
lb
-
-
$
09: 3.3133 USE OTHER WASTE CONCENTRATION METHODS Savings:
$4,680
Cost:
$140
- - - - $4,680 - - - - - - - -
-
kWh
-
-
MMBtu
$4,680
-
Tgal
-
-
lb
-
-
lb
-
-
$
10: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$776
Cost:
$5,000
- - - - - - $776 - - - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
$776
-
lb
-
-
lb
-
-
$
11: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$68
Cost:
-
- - - - - - - - $68 - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
$68
-
lb
-
-
$
12: 4.1120 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$180,000
Cost:
$11,000
- - - - - - - - - - $180,000 - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
lb
$180,000
-
$
TOTAL RECOMMENDED Savings:
$218,483
Cost:
$35,031
$49,636 818,289 $(-18,735) (-2,973) $4,680 - $776 - $68 - $182,058 - $49,636
818,289
kWh
$(-18,735)
(-2,973)
MMBtu
$4,680
-
Tgal
$776
-
lb
$68
-
lb
$182,058
-
$
TOTAL IMPLEMENTED Savings:
$182,661
Cost:
$11,145
$2,661 43,963 - - - - - - - - $180,000 - $2,661
43,963
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
lb
$180,000
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ lb $ lb $ $
Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Solid Waste (haz) Administrative Changes