IAC logo
IAC Assessment: WV0180
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0180
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1999
Principal Product Tractor Trailer Brake Cam
NAICS n/a
SIC 3625 - Relays And Industrial Controls
Sales $5,000,000-$10,000,000
# of Employees 55
Plant Area (Sq.Ft.) 42,500
Annual Production 0 Units
Production Hrs. Annual 3,504
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $97,496 2,644,783 kWh $0.04
Electricity Demand $69,623 13,762 kW-months/year $5.06
Electricity Fees $39 - $ -
Natural Gas $4,663 530 MMBtu $8.80
TOTAL ENERGY COSTS $171,821
RECOMMENDED SAVINGS* $127,789 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $49,856
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
01: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,188
Cost:
$867
$1,188 32,239 - - - - - - - - - - $1,188
32,239
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$30
Cost:
-
$30 879 - - - - - - - - - - $30
879
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
03: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$87
Cost:
$423
$87 2,345 - - - - - - - - - - $87
2,345
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
04: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$2,992
Cost:
$1,125
$2,992 81,184 - - - - - - - - - - $2,992
81,184
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$39,780
Cost:
$3,000
- - $39,780 - - - - - - - - - -
-
kWh
$39,780
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,447
Cost:
$27
$1,447 39,273 - - - - - - - - - - $1,447
39,273
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$71,180
Cost:
$39,000
$46,763 1,269,050 $51,480 13,200 $(-27,063) (-5,413) - - - - - - $46,763
1,269,050
kWh
$51,480
13,200
kW-months/year
$(-27,063)
(-5,413)
MMBtu
-
-
Tgal
-
-
lb
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$370
Cost:
$90
$370 9,965 - - - - - - - - - - $370
9,965
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$550
Cost:
$201
$550 14,947 - - - - - - - - - - $550
14,947
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
10: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$750
Cost:
$250
- - - - - - - - $750 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$750
-
lb
-
-
$
11: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$1,107
Cost:
$50
- - - - - - $1,107 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,107
-
Tgal
-
-
lb
-
-
$
12: 4.444 INSTALL SYSTEM TO COLLECT SCRAP Savings:
$8,308
Cost:
$500
- - - - - - - - - - $8,308 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$8,308
-
$
TOTAL RECOMMENDED Savings:
$127,789
Cost:
$45,533
$53,427 1,449,882 $91,260 13,200 $(-27,063) (-5,413) $1,107 - $750 - $8,308 - $53,427
1,449,882
kWh
$91,260
13,200
kW-months/year
$(-27,063)
(-5,413)
MMBtu
$1,107
-
Tgal
$750
-
lb
$8,308
-
$
TOTAL IMPLEMENTED Savings:
$49,856
Cost:
$4,568
$1,768 48,065 $39,780 - - - - - - - $8,308 - $1,768
48,065
kWh
$39,780
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$8,308
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes