Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2002 |
Principal Product | Envelopes |
NAICS | n/a |
SIC | 2677 - Envelopes |
Sales | $100,000,000-$500,000,000 |
# of Employees | 848 |
Plant Area (Sq.Ft.) | 380,000 |
Annual Production | 2,147,483,647 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $346,421 | 19,651,200 | kWh | $0.02 |
Electricity Demand | $246,635 | 39,824 | kW-months/year | $6.19 |
Natural Gas | $89,412 | 7,763 | MMBtu | $11.52 |
TOTAL ENERGY COSTS | $682,468 | |||
RECOMMENDED SAVINGS* | $154,003 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $73,638 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $12,180 Cost: $4,900 |
$8,540 | 305,892 | $3,640 | 49 | - | - | - | - | - | - | - | - |
$8,540 305,892 kWh |
$3,640 49 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD |
Savings: $826 Cost: $585 |
$581 | 47,847 | $245 | 3 | - | - | - | - | - | - | - | - |
$581 47,847 kWh |
$245 3 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL |
Savings: $29,035 Cost: $44,954 |
$20,344 | 728,691 | $8,691 | 117 | - | - | - | - | - | - | - | - |
$20,344 728,691 kWh |
$8,691 117 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,403 Cost: $124 |
$985 | 35,226 | $418 | 6 | - | - | - | - | - | - | - | - |
$985 35,226 kWh |
$418 6 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $37,820 Cost: $422 |
- | - | - | - | $37,820 | 3,284 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$37,820 3,284 MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $7,340 Cost: $84 |
$5,146 | 184,340 | $2,194 | 30 | - | - | - | - | - | - | - | - |
$5,146 184,340 kWh |
$2,194 30 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $1,206 Cost: $3,600 |
$564 | 20,218 | $642 | 9 | - | - | - | - | - | - | - | - |
$564 20,218 kWh |
$642 9 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,272 Cost: $750 |
$892 | 31,937 | $380 | 5 | - | - | - | - | - | - | - | - |
$892 31,937 kWh |
$380 5 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $12,994 Cost: $560 |
$9,233 | 330,211 | $3,929 | 53 | - | - | - | - | $(-168) | - | - | - |
$9,233 330,211 kWh |
$3,929 53 kW-months/year |
- - MMBtu |
- - gal |
$(-168) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $8,237 Cost: $2,163 |
- | - | - | - | $8,237 | 715 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$8,237 715 MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $5,850 Cost: $1,537 |
- | - | - | - | - | - | $5,850 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$5,850 - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT |
Savings: $21,840 Cost: $13,000 |
- | - | - | - | - | - | - | - | - | - | $21,840 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
$21,840 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $14,000 Cost: $6,000 |
- | - | - | - | - | - | - | - | - | - | $14,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
$14,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $154,003 Cost: $78,679 |
$46,285 | 1,684,362 | $20,139 | 272 | $46,057 | 3,999 | $5,850 | - | $(-168) | - | $35,840 | - | $46,285 1,684,362 kWh |
$20,139 272 kW-months/year |
$46,057 3,999 MMBtu |
$5,850 - gal |
$(-168) - $ |
$35,840 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $73,638 Cost: $10,901 |
$24,956 | 920,445 | $11,030 | 149 | $37,820 | 3,284 | - | - | $(-168) | - | - | - | $24,956 920,445 kWh |
$11,030 149 kW-months/year |
$37,820 3,284 MMBtu |
- - gal |
$(-168) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Personnel Changes | Administrative Changes |