Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2002 |
Principal Product | Welded Assembly for Automobiles |
NAICS | n/a |
SIC | 3544 - Special Dies, Tools, Jigs & Fixtures |
Sales | $50,000,000-$100,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 45,900 Pieces |
Production Hrs. Annual | 4,340 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $100,541 | 1,912,480 | kWh | $0.05 |
Electricity Demand | $22,291 | 4,200 | kW-months/year | $5.31 |
Natural Gas | $936 | 85 | MMBtu | $11.01 |
TOTAL ENERGY COSTS | $123,768 | |||
RECOMMENDED SAVINGS* | $42,925 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $23,778 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Water Consumption | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,740 Cost: $100 |
$2,307 | 44,185 | $433 | 72 | - | - | - | - | - | - | - | - |
$2,307 44,185 kWh |
$433 72 kW-months/year |
- - lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE |
Savings: $424 Cost: $60 |
$323 | 6,187 | $101 | 17 | - | - | - | - | - | - | - | - |
$323 6,187 kWh |
$101 17 kW-months/year |
- - lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,462 Cost: $188 |
$1,232 | 23,396 | $230 | 38 | - | - | - | - | - | - | - | - |
$1,232 23,396 kWh |
$230 38 kW-months/year |
- - lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,250 Cost: $315 |
$1,710 | 32,634 | $540 | 90 | - | - | - | - | - | - | - | - |
$1,710 32,634 kWh |
$540 90 kW-months/year |
- - lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,894 Cost: $2,910 |
$1,232 | 23,291 | $662 | 110 | - | - | - | - | - | - | - | - |
$1,232 23,291 kWh |
$662 110 kW-months/year |
- - lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $5,806 Cost: - |
$3,742 | 71,658 | $2,064 | 344 | - | - | - | - | - | - | - | - |
$3,742 71,658 kWh |
$2,064 344 kW-months/year |
- - lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $649 Cost: $450 |
$493 | 9,376 | $156 | 26 | - | - | - | - | - | - | - | - |
$493 9,376 kWh |
$156 26 kW-months/year |
- - lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $4,813 Cost: - |
$2,941 | 55,963 | $1,872 | 312 | - | - | - | - | - | - | - | - |
$2,941 55,963 kWh |
$1,872 312 kW-months/year |
- - lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2692 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER |
Savings: $6,165 Cost: - |
$5,421 | 103,118 | $1,728 | 288 | - | - | - | - | - | - | $(-984) | - |
$5,421 103,118 kWh |
$1,728 288 kW-months/year |
- - lb |
- - $ |
- - $ |
$(-984) - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $1,562 Cost: $150 |
$1,324 | 25,198 | $418 | 70 | - | - | $(-180) | - | - | - | - | - |
$1,324 25,198 kWh |
$418 70 kW-months/year |
- - lb |
$(-180) - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.5317 SELL / OFFER BY-PRODUCT AS ANIMAL FEED |
Savings: $2,080 Cost: $100 |
- | - | - | - | $2,080 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,080 - lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $1,560 Cost: $100 |
- | - | - | - | $1,560 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,560 - lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 4.621 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES |
Savings: $11,520 Cost: $1,620 |
- | - | - | - | - | - | - | - | $11,520 | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
- - $ |
$11,520 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $42,925 Cost: $5,993 |
$20,725 | 395,006 | $8,204 | 1,367 | $3,640 | - | $(-180) | - | $11,520 | - | $(-984) | - | $20,725 395,006 kWh |
$8,204 1,367 kW-months/year |
$3,640 - lb |
$(-180) - $ |
$11,520 - $ |
$(-984) - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $23,778 Cost: $4,185 |
$14,072 | 268,492 | $6,246 | 1,041 | $3,640 | - | $(-180) | - | - | - | - | - | $14,072 268,492 kWh |
$6,246 1,041 kW-months/year |
$3,640 - lb |
$(-180) - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Water Consumption | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Water Consumption |