Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2002 |
Principal Product | Metal coatings |
NAICS | n/a |
SIC | 3471 - Plating And Polishing |
Sales | $10,000,000-$50,000,000 |
# of Employees | 185 |
Plant Area (Sq.Ft.) | 140,000 |
Annual Production | 200,000 Pieces |
Production Hrs. Annual | 5,100 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $338,529 | 5,249,460 | kWh | $0.06 |
Electricity Demand | $85,065 | 11,862 | kW-months/year | $7.17 |
Natural Gas | $708,124 | 73,568 | MMBtu | $9.63 |
TOTAL ENERGY COSTS | $1,131,718 | |||
RECOMMENDED SAVINGS* | $281,483 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $48,272 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $8,858 Cost: $13,440 |
$6,992 | 107,489 | $1,866 | 25 | - | - | - | - | - | - | - | - |
$6,992 107,489 kWh |
$1,866 25 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,082 Cost: $500 |
$800 | 12,306 | $282 | 4 | - | - | - | - | - | - | - | - |
$800 12,306 kWh |
$282 4 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $14,589 Cost: $4,390 |
- | - | - | - | $14,589 | 1,515 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$14,589 1,515 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $10,526 Cost: $1,582 |
- | - | - | - | $10,526 | 1,093 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$10,526 1,093 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $3,072 Cost: $1,080 |
- | - | - | - | $3,072 | 319 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,072 319 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,529 Cost: - |
$2,058 | 31,644 | $471 | 6 | - | - | - | - | - | - | - | - |
$2,058 31,644 kWh |
$471 6 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD |
Savings: $1,408 Cost: $1,044 |
$273 | 36,625 | $1,135 | 7 | - | - | - | - | - | - | - | - |
$273 36,625 kWh |
$1,135 7 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $5,932 Cost: $5,580 |
- | - | - | - | $5,932 | 616 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,932 616 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $18,443 Cost: $140 |
- | - | - | - | $18,443 | 1,915 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$18,443 1,915 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $5,680 Cost: $300 |
$4,770 | 73,250 | $1,090 | 14 | - | - | - | - | $(-180) | - | - | - |
$4,770 73,250 kWh |
$1,090 14 kW-months/year |
- - MMBtu |
- - lb |
$(-180) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $174,164 Cost: $15,000 |
- | - | - | - | - | - | $174,164 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$174,164 - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $7,200 Cost: $100 |
- | - | - | - | - | - | $7,200 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$7,200 - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $28,000 Cost: $12,000 |
- | - | - | - | - | - | - | - | - | - | $28,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$28,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $281,483 Cost: $55,156 |
$14,893 | 261,314 | $4,844 | 56 | $52,562 | 5,458 | $181,364 | - | $(-180) | - | $28,000 | - | $14,893 261,314 kWh |
$4,844 56 kW-months/year |
$52,562 5,458 MMBtu |
$181,364 - lb |
$(-180) - $ |
$28,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $48,272 Cost: $16,604 |
$14,893 | 261,314 | $4,844 | 56 | $21,515 | 2,234 | $7,200 | - | $(-180) | - | - | - | $14,893 261,314 kWh |
$4,844 56 kW-months/year |
$21,515 2,234 MMBtu |
$7,200 - lb |
$(-180) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes |