IAC logo
IAC Assessment: WV0242
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0242
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2002
Principal Product Kiln dried lumber
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $5,000,000-$10,000,000
# of Employees 165
Plant Area (Sq.Ft.) 40,000
Annual Production 400,000 Thousand Feet
Production Hrs. Annual 2,550
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $541,199 11,469,248 kWh $0.05
Wood $12,750 45,109 MMBtu $0.28
TOTAL ENERGY COSTS $553,949
RECOMMENDED SAVINGS* $187,829 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,310
#|Description Savings
Cost
Status Electricity Usage Wood Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Wood Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ MMBtu $ lb $ $ $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,167
Cost:
-
$3,167 67,097 - - - - - - - - $3,167
67,097
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$611
Cost:
$1,695
- - $611 2,160 - - - - - - -
-
kWh
$611
2,160
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$7,620
Cost:
$4,870
$7,620 161,443 - - - - - - - - $7,620
161,443
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$871
Cost:
$116
$871 18,447 - - - - - - - - $871
18,447
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,564
Cost:
$128
$4,564 211,751 - - - - - - - - $4,564
211,751
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$456
Cost:
$72
$456 9,509 - - - - - - - - $456
9,509
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$304
Cost:
-
$304 6,420 - - - - - - - - $304
6,420
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
08: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$8,335
Cost:
$900
$8,623 182,539 - - - - $(-288) - - - $8,623
182,539
kWh
-
-
MMBtu
-
-
lb
$(-288)
-
$
-
-
$
09: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$5,537
Cost:
$4,000
- - - - $5,537 - - - - - -
-
kWh
-
-
MMBtu
$5,537
-
lb
-
-
$
-
-
$
10: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$864
Cost:
$400
- - - - $864 - - - - - -
-
kWh
-
-
MMBtu
$864
-
lb
-
-
$
-
-
$
11: 4.1260 INSTALL SENSORS TO DETECT DEFECTS Savings:
$127,500
Cost:
$13,480
- - - - - - - - $127,500 - -
-
kWh
-
-
MMBtu
-
-
lb
-
-
$
$127,500
-
$
12: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$28,000
Cost:
$12,000
- - - - - - - - $28,000 - -
-
kWh
-
-
MMBtu
-
-
lb
-
-
$
$28,000
-
$
TOTAL RECOMMENDED Savings:
$187,829
Cost:
$37,661
$25,605 657,206 $611 2,160 $6,401 - $(-288) - $155,500 - $25,605
657,206
kWh
$611
2,160
MMBtu
$6,401
-
lb
$(-288)
-
$
$155,500
-
$
TOTAL IMPLEMENTED Savings:
$25,310
Cost:
$6,370
$24,734 638,759 - - $864 - $(-288) - - - $24,734
638,759
kWh
-
-
MMBtu
$864
-
lb
$(-288)
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $ $ $
Electricity Usage Wood Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Wood Solid Waste (non-haz) Personnel Changes Administrative Changes