Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2002 |
Principal Product | Ice Cream |
NAICS | n/a |
SIC | 2024 - Ice Cream And Frozen Desserts |
Sales | $100,000,000-$500,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 145,000 |
Annual Production | 11,000 Thousand Gallons |
Production Hrs. Annual | 5,500 |
Location (State) | MD |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $813,354 | 25,386,900 | kWh | $0.03 |
Natural Gas | $94,131 | 13,068 | MMBtu | $7.20 |
TOTAL ENERGY COSTS | $907,485 | |||
RECOMMENDED SAVINGS* | $106,567 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $64,673 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $5,136 Cost: $108 |
$5,136 | 160,271 | - | - | - | - | - | - | - | - | - | - |
$5,136 160,271 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $19,433 Cost: $900 |
$19,757 | 616,472 | - | - | - | - | - | - | $(-324) | - | - | - |
$19,757 616,472 kWh |
- - MMBtu |
- - Tgal |
- - lb |
$(-324) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,318 Cost: $193 |
- | - | $1,318 | 183 | - | - | - | - | - | - | - | - |
- - kWh |
$1,318 183 MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $3,380 Cost: $4,950 |
$3,380 | 105,600 | - | - | - | - | - | - | - | - | - | - |
$3,380 105,600 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $2,244 Cost: $19,144 |
$2,244 | 70,027 | - | - | - | - | - | - | - | - | - | - |
$2,244 70,027 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT |
Savings: $9,994 Cost: $10,000 |
- | - | $9,994 | 1,388 | - | - | - | - | - | - | - | - |
- - kWh |
$9,994 1,388 MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $9,266 Cost: $4,270 |
- | - | $9,266 | 1,287 | - | - | - | - | - | - | - | - |
- - kWh |
$9,266 1,287 MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4155 METER WASTE WATER |
Savings: $29,520 Cost: $944 |
- | - | - | - | $29,520 | - | - | - | - | - | - | - |
- - kWh |
- - MMBtu |
$29,520 - Tgal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $13,076 Cost: $4,000 |
- | - | - | - | - | - | $13,076 | - | - | - | - | - |
- - kWh |
- - MMBtu |
- - Tgal |
$13,076 - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $13,200 Cost: $11,000 |
- | - | - | - | - | - | - | - | - | - | $13,200 | - |
- - kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
$13,200 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $106,567 Cost: $55,509 |
$30,517 | 952,370 | $20,578 | 2,858 | $29,520 | - | $13,076 | - | $(-324) | - | $13,200 | - | $30,517 952,370 kWh |
$20,578 2,858 MMBtu |
$29,520 - Tgal |
$13,076 - lb |
$(-324) - $ |
$13,200 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $64,673 Cost: $6,415 |
$24,893 | 776,743 | $10,584 | 1,470 | $29,520 | - | - | - | $(-324) | - | - | - | $24,893 776,743 kWh |
$10,584 1,470 MMBtu |
$29,520 - Tgal |
- - lb |
$(-324) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Administrative Changes |