IAC logo
IAC Assessment: WV0244
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0244
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2002
Principal Product Ice Cream
NAICS n/a
SIC 2024 - Ice Cream And Frozen Desserts
Sales $100,000,000-$500,000,000
# of Employees 300
Plant Area (Sq.Ft.) 145,000
Annual Production 11,000 Thousand Gallons
Production Hrs. Annual 5,500
Location (State) MD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $813,354 25,386,900 kWh $0.03
Natural Gas $94,131 13,068 MMBtu $7.20
TOTAL ENERGY COSTS $907,485
RECOMMENDED SAVINGS* $106,567 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $64,673
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ MMBtu $ Tgal $ lb $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,136
Cost:
$108
$5,136 160,271 - - - - - - - - - - $5,136
160,271
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
02: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$19,433
Cost:
$900
$19,757 616,472 - - - - - - $(-324) - - - $19,757
616,472
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
$(-324)
-
$
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,318
Cost:
$193
- - $1,318 183 - - - - - - - - -
-
kWh
$1,318
183
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
04: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$3,380
Cost:
$4,950
$3,380 105,600 - - - - - - - - - - $3,380
105,600
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,244
Cost:
$19,144
$2,244 70,027 - - - - - - - - - - $2,244
70,027
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
06: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$9,994
Cost:
$10,000
- - $9,994 1,388 - - - - - - - - -
-
kWh
$9,994
1,388
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$9,266
Cost:
$4,270
- - $9,266 1,287 - - - - - - - - -
-
kWh
$9,266
1,287
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
08: 3.4155 METER WASTE WATER Savings:
$29,520
Cost:
$944
- - - - $29,520 - - - - - - - -
-
kWh
-
-
MMBtu
$29,520
-
Tgal
-
-
lb
-
-
$
-
-
$
09: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$13,076
Cost:
$4,000
- - - - - - $13,076 - - - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
$13,076
-
lb
-
-
$
-
-
$
10: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$13,200
Cost:
$11,000
- - - - - - - - - - $13,200 - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$13,200
-
$
TOTAL RECOMMENDED Savings:
$106,567
Cost:
$55,509
$30,517 952,370 $20,578 2,858 $29,520 - $13,076 - $(-324) - $13,200 - $30,517
952,370
kWh
$20,578
2,858
MMBtu
$29,520
-
Tgal
$13,076
-
lb
$(-324)
-
$
$13,200
-
$
TOTAL IMPLEMENTED Savings:
$64,673
Cost:
$6,415
$24,893 776,743 $10,584 1,470 $29,520 - - - $(-324) - - - $24,893
776,743
kWh
$10,584
1,470
MMBtu
$29,520
-
Tgal
-
-
lb
$(-324)
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ lb $ $ $ $
Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes