IAC Assessment: WV0245
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0245
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2002
Principal Product Bricks
NAICS n/a
SIC 3251 - Brick And Structural Clay Tile
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 131,980
Annual Production 55,000,000 Pieces
Production Hrs. Annual 4,680
Location (State) MD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $141,887 6,138,639 kWh $0.02
Electricity Demand $133,732 13,448 kW-months/year $9.94
Electricity Fees $40,413 - $ -
Natural Gas $1,441,815 219,872 MMBtu $6.56
TOTAL ENERGY COSTS $1,757,847
RECOMMENDED SAVINGS* $29,967 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,894
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,684
Cost:
-
$2,836 95,518 $1,848 20 - - - - - - - - $2,836
95,518
kWh
$1,848
20
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$348
Cost:
$151
- - - - $348 53 - - - - - - -
-
kWh
-
-
kW-months/year
$348
53
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$945
Cost:
-
$573 19,227 $372 4 - - - - - - - - $573
19,227
kWh
$372
4
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$414
Cost:
$100
$251 8,449 $163 2 - - - - - - - - $251
8,449
kWh
$163
2
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$6,015
Cost:
$230
$3,976 133,901 $2,591 29 - - - - $(-552) - - - $3,976
133,901
kWh
$2,591
29
kW-months/year
-
-
MMBtu
-
-
lb
$(-552)
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,109
Cost:
$138
$1,131 50,689 $978 11 - - - - - - - - $1,131
50,689
kWh
$978
11
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,052
Cost:
$930
$635 21,389 $417 5 - - - - - - - - $635
21,389
kWh
$417
5
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
08: 2.7134 USE PHOTOCELL CONTROLS Savings:
$579
Cost:
$300
$191 6,446 $388 4 - - - - - - - - $191
6,446
kWh
$388
4
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
09: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$5,021
Cost:
$4,000
- - - - - - $5,021 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,021
-
lb
-
-
$
-
-
$
10: 4.3220 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$3,800
Cost:
$690
- - - - - - - - - - $3,800 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$3,800
-
$
11: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$5,000
Cost:
$845
- - - - - - - - - - $5,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$5,000
-
$
TOTAL RECOMMENDED Savings:
$29,967
Cost:
$7,384
$9,593 335,619 $6,757 75 $348 53 $5,021 - $(-552) - $8,800 - $9,593
335,619
kWh
$6,757
75
kW-months/year
$348
53
MMBtu
$5,021
-
lb
$(-552)
-
$
$8,800
-
$
TOTAL IMPLEMENTED Savings:
$18,894
Cost:
$1,609
$8,958 314,230 $6,340 70 $348 53 - - $(-552) - $3,800 - $8,958
314,230
kWh
$6,340
70
kW-months/year
$348
53
MMBtu
-
-
lb
$(-552)
-
$
$3,800
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes