IAC logo
IAC Assessment: WV0265
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0265
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2003
Principal Product Green Lumber
NAICS 321912 - Cut Stock, Resawing Lumber, and Planing
SIC 2421 - Sawmills And Planing Mills, General
Sales $1,000,000-$5,000,000
# of Employees 60
Plant Area (Sq.Ft.) 37,000
Annual Production 8,000 Thousand Feet
Production Hrs. Annual 2,410
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $108,517 1,647,847 kWh $0.07
Electricity Demand $44,300 7,308 kW-months/year $6.06
TOTAL ENERGY COSTS $152,817
RECOMMENDED SAVINGS* $18,506 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,500
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$207
Cost:
-
$102 1,738 $105 1 $102
1,738
kWh
$105
1
kW-months/year
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$801
Cost:
$2,160
$504 12,934 $297 4 $504
12,934
kWh
$297
4
kW-months/year
03: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$7,007
Cost:
$915
$3,953 101,378 $3,054 42 $3,953
101,378
kWh
$3,054
42
kW-months/year
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,172
Cost:
$30
$663 17,009 $509 7 $663
17,009
kWh
$509
7
kW-months/year
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,218
Cost:
$2,025
$3,506 89,951 $2,712 37 $3,506
89,951
kWh
$2,712
37
kW-months/year
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,095
Cost:
$250
$617 15,857 $478 7 $617
15,857
kWh
$478
7
kW-months/year
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$406
Cost:
$405
$228 5,900 $178 2 $228
5,900
kWh
$178
2
kW-months/year
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,600
Cost:
$40
$902 23,134 $698 10 $902
23,134
kWh
$698
10
kW-months/year
TOTAL RECOMMENDED Savings:
$18,506
Cost:
$5,825
$10,475 267,901 $8,031 110 $10,475
267,901
kWh
$8,031
110
kW-months/year
TOTAL IMPLEMENTED Savings:
$16,500
Cost:
$5,380
$9,345 238,867 $7,155 98 $9,345
238,867
kWh
$7,155
98
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand