IAC logo
IAC Assessment: WV0267
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0267
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2003
Principal Product Wood veneer
NAICS 321212 - Softwood Veneer and Plywood Manufacturing
SIC 2436 - Softwood Veneer And Plywood
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 200,000
Annual Production 150,000,000 Thousand Feet
Production Hrs. Annual 4,335
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $118,964 4,327,670 kWh $0.03
Electricity Demand $113,149 12,765 kW-months/year $8.86
TOTAL ENERGY COSTS $232,113
RECOMMENDED SAVINGS* $43,641 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,895
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Primary Raw Material Electricity Usage Electricity Demand Primary Raw Material
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,580
Cost:
-
$3,808 72,685 $1,772 200 - - $3,808
72,685
kWh
$1,772
200
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,522
Cost:
$2,820
$1,619 25,551 $903 102 - - $1,619
25,551
kWh
$903
102
kW-months/year
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$582
Cost:
$150
$370 5,627 $212 24 - - $370
5,627
kWh
$212
24
kW-months/year
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,402
Cost:
$30
$2,603 64,478 $799 90 - - $2,603
64,478
kWh
$799
90
kW-months/year
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,185
Cost:
$135
$1,672 41,325 $513 58 - - $1,672
41,325
kWh
$513
58
kW-months/year
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$353
Cost:
$395
$271 6,741 $82 9 - - $271
6,741
kWh
$82
9
kW-months/year
-
-
$
07: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$9,920
Cost:
$1,125
$6,837 146,835 $3,083 348 - - $6,837
146,835
kWh
$3,083
348
kW-months/year
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,946
Cost:
-
$5,737 117,526 $209 276 - - $5,737
117,526
kWh
$209
276
kW-months/year
-
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,148
Cost:
$1,475
- - - - $3,148 - -
-
kWh
-
-
kW-months/year
$3,148
-
$
10: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,644
Cost:
$12,320
$2,644 - - - - - $2,644
-
kWh
-
-
kW-months/year
-
-
$
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$684
Cost:
$250
$684 16,999 - - - - $684
16,999
kWh
-
-
kW-months/year
-
-
$
12: 3.4151 MINIMIZE WATER USAGE Savings:
$6,675
Cost:
$4,000
- - - - $6,675 - -
-
kWh
-
-
kW-months/year
$6,675
-
$
TOTAL RECOMMENDED Savings:
$43,641
Cost:
$22,700
$26,245 497,767 $7,573 1,107 $9,823 - $26,245
497,767
kWh
$7,573
1,107
kW-months/year
$9,823
-
$
TOTAL IMPLEMENTED Savings:
$32,895
Cost:
$7,560
$18,174 399,531 $4,898 805 $9,823 - $18,174
399,531
kWh
$4,898
805
kW-months/year
$9,823
-
$
Savings