IAC logo
IAC Assessment: WV0274
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0274
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2003
Principal Product Kiln Dried Lumber
NAICS 321912 - Cut Stock, Resawing Lumber, and Planing
SIC 2421 - Sawmills And Planing Mills, General
Sales $5,000,000-$10,000,000
# of Employees 14
Plant Area (Sq.Ft.) 61,170
Annual Production 5,000 Thousand Feet
Production Hrs. Annual 2,125
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $28,376 511,200 kWh $0.06
Electricity Fees $(-900) - $ -
Natural Gas $168,580 26,875 MMBtu $6.27
TOTAL ENERGY COSTS $196,056
RECOMMENDED SAVINGS* $42,131 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,665
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$22,034
Cost:
$1,640
- - $22,034 3,459 - - -
-
kWh
$22,034
3,459
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$7,198
Cost:
$1,000
- - $7,198 1,148 - - -
-
kWh
$7,198
1,148
MMBtu
-
-
$
03: 3.7311 MAINTAIN MACHINES TO REDUCE LEAKS Savings:
$5,774
Cost:
$35
- - $5,774 921 - - -
-
kWh
$5,774
921
MMBtu
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,173
Cost:
$252
- - $3,173 506 - - -
-
kWh
$3,173
506
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,432
Cost:
$2,093
$1,432 26,638 - - - - $1,432
26,638
kWh
-
-
MMBtu
-
-
$
06: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$1,068
Cost:
$435
$1,242 23,147 - - $(-174) - $1,242
23,147
kWh
-
-
MMBtu
$(-174)
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$772
Cost:
$2,925
$772 14,357 - - - - $772
14,357
kWh
-
-
MMBtu
-
-
$
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$654
Cost:
$73
$654 12,155 - - - - $654
12,155
kWh
-
-
MMBtu
-
-
$
09: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$26
Cost:
-
$26 491 - - - - $26
491
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$42,131
Cost:
$8,453
$4,126 76,788 $38,179 6,034 $(-174) - $4,126
76,788
kWh
$38,179
6,034
MMBtu
$(-174)
-
$
TOTAL IMPLEMENTED Savings:
$18,665
Cost:
$4,720
$2,694 50,150 $16,145 2,575 $(-174) - $2,694
50,150
kWh
$16,145
2,575
MMBtu
$(-174)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes