Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2003 |
Principal Product | Kiln Dried Lumber |
NAICS | 321912 - Cut Stock, Resawing Lumber, and Planing |
SIC | 2421 - Sawmills And Planing Mills, General |
Sales | $5,000,000-$10,000,000 |
# of Employees | 14 |
Plant Area (Sq.Ft.) | 61,170 |
Annual Production | 5,000 Thousand Feet |
Production Hrs. Annual | 2,125 |
Location (State) | WV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $28,376 | 511,200 | kWh | $0.06 |
Electricity Fees | $(-900) | - | $ | - |
Natural Gas | $168,580 | 26,875 | MMBtu | $6.27 |
TOTAL ENERGY COSTS | $196,056 | |||
RECOMMENDED SAVINGS* | $42,131 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $18,665 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Personnel Changes | Electricity Usage | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $22,034 Cost: $1,640 |
- | - | $22,034 | 3,459 | - | - |
- - kWh |
$22,034 3,459 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $7,198 Cost: $1,000 |
- | - | $7,198 | 1,148 | - | - |
- - kWh |
$7,198 1,148 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.7311 MAINTAIN MACHINES TO REDUCE LEAKS |
Savings: $5,774 Cost: $35 |
- | - | $5,774 | 921 | - | - |
- - kWh |
$5,774 921 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $3,173 Cost: $252 |
- | - | $3,173 | 506 | - | - |
- - kWh |
$3,173 506 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,432 Cost: $2,093 |
$1,432 | 26,638 | - | - | - | - |
$1,432 26,638 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $1,068 Cost: $435 |
$1,242 | 23,147 | - | - | $(-174) | - |
$1,242 23,147 kWh |
- - MMBtu |
$(-174) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $772 Cost: $2,925 |
$772 | 14,357 | - | - | - | - |
$772 14,357 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $654 Cost: $73 |
$654 | 12,155 | - | - | - | - |
$654 12,155 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $26 Cost: - |
$26 | 491 | - | - | - | - |
$26 491 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $42,131 Cost: $8,453 |
$4,126 | 76,788 | $38,179 | 6,034 | $(-174) | - | $4,126 76,788 kWh |
$38,179 6,034 MMBtu |
$(-174) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $18,665 Cost: $4,720 |
$2,694 | 50,150 | $16,145 | 2,575 | $(-174) | - | $2,694 50,150 kWh |
$16,145 2,575 MMBtu |
$(-174) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Personnel Changes | Electricity Usage | Natural Gas | Personnel Changes |