IAC Assessment: WV0275
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0275
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2003
Principal Product Precision fasteners
NAICS 332722 - Bolt, Nut, Screw, Rivet, and Washer Manufacturing
SIC 3452 - Bolts, Nuts, Rivets, And Washers
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 400,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 8,400
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $725,222 13,922,499 kWh $0.05
Electricity Demand $166,812 303,372 kW-months/year $0.55
Electricity Fees $221,454 - $ -
Natural Gas $781,608 142,598 MMBtu $5.48
TOTAL ENERGY COSTS $1,895,096
RECOMMENDED SAVINGS* $441,902 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $97,320
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$277,857
Cost:
$145,760
- - - - $292,857 53,441 $(-15,000) - -
-
kWh
-
-
kW-months/year
$292,857
53,441
MMBtu
$(-15,000)
-
$
02: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$29,059
Cost:
$900
$26,430 388,811 $3,349 507 - - $(-720) - $26,430
388,811
kWh
$3,349
507
kW-months/year
-
-
MMBtu
$(-720)
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$16,752
Cost:
$1,110
- - - - $16,752 3,057 - - -
-
kWh
-
-
kW-months/year
$16,752
3,057
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,337
Cost:
$7,217
$14,348 211,041 $1,989 302 - - - - $14,348
211,041
kWh
$1,989
302
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,308
Cost:
-
$14,322 210,672 $1,986 301 - - - - $14,322
210,672
kWh
$1,986
301
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$13,654
Cost:
$800
$11,992 176,400 $1,662 252 - - - - $11,992
176,400
kWh
$1,662
252
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,244
Cost:
$8,370
$10,139 149,194 $3,105 470 - - - - $10,139
149,194
kWh
$3,105
470
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$13,170
Cost:
$360
$11,566 170,233 $1,604 243 - - - - $11,566
170,233
kWh
$1,604
243
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$12,345
Cost:
$1,860
$10,841 159,557 $1,504 228 - - - - $10,841
159,557
kWh
$1,504
228
kW-months/year
-
-
MMBtu
-
-
$
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,549
Cost:
$500
$8,386 123,323 $1,163 176 - - - - $8,386
123,323
kWh
$1,163
176
kW-months/year
-
-
MMBtu
-
-
$
11: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$9,135
Cost:
$3,600
- - - - $9,135 1,667 - - -
-
kWh
-
-
kW-months/year
$9,135
1,667
MMBtu
-
-
$
12: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$8,440
Cost:
$1,200
$7,412 109,032 $1,028 156 - - - - $7,412
109,032
kWh
$1,028
156
kW-months/year
-
-
MMBtu
-
-
$
13: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,716
Cost:
$1,300
$3,264 47,996 $452 69 - - - - $3,264
47,996
kWh
$452
69
kW-months/year
-
-
MMBtu
-
-
$
14: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,336
Cost:
$1,200
$2,052 30,179 $284 43 - - - - $2,052
30,179
kWh
$284
43
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$441,902
Cost:
$174,177
$120,752 1,776,438 $18,126 2,747 $318,744 58,165 $(-15,720) - $120,752
1,776,438
kWh
$18,126
2,747
kW-months/year
$318,744
58,165
MMBtu
$(-15,720)
-
$
TOTAL IMPLEMENTED Savings:
$97,320
Cost:
$12,130
$84,887 1,248,812 $13,153 1,992 - - $(-720) - $84,887
1,248,812
kWh
$13,153
1,992
kW-months/year
-
-
MMBtu
$(-720)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes