IAC Assessment: WV0279
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0279
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2003
Principal Product Plastic Injection Molding
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 93
Plant Area (Sq.Ft.) 72,000
Annual Production 50,000,000 Pieces
Production Hrs. Annual 7,488
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $321,628 5,941,500 kWh $0.05
Electricity Fees $6,227 - $ -
TOTAL ENERGY COSTS $327,855
RECOMMENDED SAVINGS* $115,841 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $105,137
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Electricity Usage Personnel Changes
$ kWh $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$46,327
Cost:
$15,420
$46,327 839,353 - - $46,327
839,353
kWh
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$27,812
Cost:
$20,095
$27,812 503,916 - - $27,812
503,916
kWh
-
-
$
03: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$11,747
Cost:
$700
$12,587 227,954 $(-840) - $12,587
227,954
kWh
$(-840)
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$9,443
Cost:
$2,540
$9,443 171,112 - - $9,443
171,112
kWh
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,983
Cost:
$165
$5,983 108,410 - - $5,983
108,410
kWh
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,685
Cost:
$510
$5,685 103,018 - - $5,685
103,018
kWh
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,123
Cost:
$2,300
$4,123 74,861 - - $4,123
74,861
kWh
-
-
$
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,474
Cost:
$1,400
$2,474 44,797 - - $2,474
44,797
kWh
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,083
Cost:
$70
$1,083 19,551 - - $1,083
19,551
kWh
-
-
$
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$744
Cost:
$135
$744 13,456 - - $744
13,456
kWh
-
-
$
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$420
Cost:
$260
$420 7,594 - - $420
7,594
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$115,841
Cost:
$43,595
$116,681 2,114,022 $(-840) - $116,681
2,114,022
kWh
$(-840)
-
$
TOTAL IMPLEMENTED Savings:
$105,137
Cost:
$41,565
$105,977 1,920,214 $(-840) - $105,977
1,920,214
kWh
$(-840)
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Personnel Changes Electricity Usage Personnel Changes