IAC logo
IAC Assessment: WV0291
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0291
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2004
Principal Product Welded Steal tubing
NAICS 331210 - Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3317 - Steel Pipe And Tubes
Sales $10,000,000-$50,000,000
# of Employees 82
Plant Area (Sq.Ft.) 210,000
Annual Production 32,000,000 Pounds
Production Hrs. Annual 4,368
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $215,692 786,486 kWh $0.27
Electricity Demand $1,323 1,563 kW-months/year $0.85
Natural Gas $74,106 9,249 MMBtu $8.01
TOTAL ENERGY COSTS $291,121
RECOMMENDED SAVINGS* $44,199 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,535
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$14,733
Cost:
$360
$14,422 235,872 $311 54 - - $14,422
235,872
kWh
$311
54
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,255
Cost:
$1,032
$9,060 148,170 $195 407 - - $9,060
148,170
kWh
$195
407
kW-months/year
-
-
$
03: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$6,488
Cost:
-
$6,298 185,469 $466 708 $(-276) - $6,298
185,469
kWh
$466
708
kW-months/year
$(-276)
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,578
Cost:
$4,824
$5,401 87,307 $177 31 - - $5,401
87,307
kWh
$177
31
kW-months/year
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,186
Cost:
-
$2,186 35,748 - - - - $2,186
35,748
kWh
-
-
kW-months/year
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,720
Cost:
$1,316
$1,684 27,636 $36 76 - - $1,684
27,636
kWh
$36
76
kW-months/year
-
-
$
07: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$1,519
Cost:
$5,205
$1,487 24,319 $32 67 - - $1,487
24,319
kWh
$32
67
kW-months/year
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,485
Cost:
$116
$1,427 22,883 $58 120 - - $1,427
22,883
kWh
$58
120
kW-months/year
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$685
Cost:
$747
$658 10,548 $27 55 - - $658
10,548
kWh
$27
55
kW-months/year
-
-
$
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$550
Cost:
$100
$529 8,534 $21 45 - - $529
8,534
kWh
$21
45
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$44,199
Cost:
$13,700
$43,152 786,486 $1,323 1,563 $(-276) - $43,152
786,486
kWh
$1,323
1,563
kW-months/year
$(-276)
-
$
TOTAL IMPLEMENTED Savings:
$29,535
Cost:
$5,284
$28,836 552,930 $975 838 $(-276) - $28,836
552,930
kWh
$975
838
kW-months/year
$(-276)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes