Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2005 |
Principal Product | Industrial Facings |
NAICS | 322220 - Paper Bag and Coated and Treated Paper Manufacturing |
SIC | 2672 - Paper Coated And Laminated, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 42 |
Plant Area (Sq.Ft.) | 135,000 |
Annual Production | 750,000 Thousand Feet |
Production Hrs. Annual | 6,120 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $206,680 | 2,776,863 | kWh | $0.07 |
Electricity Demand | $66,106 | 10,047 | kW-months/year | $6.58 |
Electricity Fees | $11,494 | - | $ | - |
Natural Gas | $87,815 | 9,138 | MMBtu | $9.61 |
TOTAL ENERGY COSTS | $372,095 | |||
RECOMMENDED SAVINGS* | $90,825 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $38,158 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $14,732 Cost: $3,713 |
- | - | - | - | $14,732 | 1,533 | - | - |
- - kWh |
- - kW-months/year |
$14,732 1,533 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6241 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY |
Savings: $14,277 Cost: $70 |
$16,517 | 210,240 | - | - | - | - | $(-2,240) | - |
$16,517 210,240 kWh |
- - kW-months/year |
- - MMBtu |
$(-2,240) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,828 Cost: - |
$4,144 | 52,992 | $684 | 104 | - | - | - | - |
$4,144 52,992 kWh |
$684 104 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE |
Savings: $4,156 Cost: $9,591 |
- | - | - | - | $4,156 | 433 | - | - |
- - kWh |
- - kW-months/year |
$4,156 433 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,404 Cost: $5,877 |
$2,924 | 37,227 | $480 | 73 | - | - | - | - |
$2,924 37,227 kWh |
$480 73 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,829 Cost: $605 |
$1,571 | 19,997 | $258 | 39 | - | - | - | - |
$1,571 19,997 kWh |
$258 39 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,552 Cost: $404 |
$1,335 | 16,994 | $217 | 33 | - | - | - | - |
$1,335 16,994 kWh |
$217 33 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $534 Cost: $105 |
$458 | 5,841 | $76 | 11 | - | - | - | - |
$458 5,841 kWh |
$76 11 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $461 Cost: $138 |
- | - | - | - | $461 | 48 | - | - |
- - kWh |
- - kW-months/year |
$461 48 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $426 Cost: $358 |
$366 | 4,655 | $60 | 9 | - | - | - | - |
$366 4,655 kWh |
$60 9 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $406 Cost: $96 |
$1,070 | 13,478 | $176 | 27 | - | - | $(-840) | - |
$1,070 13,478 kWh |
$176 27 kW-months/year |
- - MMBtu |
$(-840) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $217 Cost: $215 |
$186 | 2,385 | $31 | 5 | - | - | - | - |
$186 2,385 kWh |
$31 5 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 4.512 CONDENSE OPERATION INTO ONE BUILDING |
Savings: $44,003 Cost: $60,000 |
$6,791 | 86,400 | $1,112 | 169 | $36,100 | 3,757 | - | - |
$6,791 86,400 kWh |
$1,112 169 kW-months/year |
$36,100 3,757 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $90,825 Cost: $81,172 |
$35,362 | 450,209 | $3,094 | 470 | $55,449 | 5,771 | $(-3,080) | - | $35,362 450,209 kWh |
$3,094 470 kW-months/year |
$55,449 5,771 MMBtu |
$(-3,080) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $38,158 Cost: $4,993 |
$25,095 | 319,542 | $1,411 | 214 | $14,732 | 1,533 | $(-3,080) | - | $25,095 319,542 kWh |
$1,411 214 kW-months/year |
$14,732 1,533 MMBtu |
$(-3,080) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |