IAC logo
IAC Assessment: WV0342
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0342
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2006
Principal Product Dairy
NAICS 311930 - Flavoring Syrup and Concentrate Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales $100,000,000-$500,000,000
# of Employees 370
Plant Area (Sq.Ft.) 450,000
Annual Production 75,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,364,436 60,885,145 kWh $0.02
Electricity Demand $806,671 106,421 kW-months/year $7.58
Electricity Fees $155,767 - $ -
Natural Gas $3,768,559 445,178 MMBtu $8.47
TOTAL ENERGY COSTS $6,095,433
RECOMMENDED SAVINGS* $795,728 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $714,641
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ Tgal
01: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$151,419
Cost:
$4,500
- - - - $151,944 17,945 $(-525) - - - - - -
-
kWh
-
-
kW-months/year
$151,944
17,945
MMBtu
$(-525)
-
$
-
-
$
-
-
Tgal
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$124,707
Cost:
$188,500
$88,096 3,526,400 $36,611 4,830 - - - - - - - - $88,096
3,526,400
kWh
$36,611
4,830
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
03: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$103,142
Cost:
$100,000
- - - - $75,349 8,896 - - $20,000 - $7,793 - -
-
kWh
-
-
kW-months/year
$75,349
8,896
MMBtu
-
-
$
$20,000
-
$
$7,793
-
Tgal
04: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN Savings:
$87,693
Cost:
$208,500
- - - - $44,052 5,201 $3,500 - $14,747 - $25,394 - -
-
kWh
-
-
kW-months/year
$44,052
5,201
MMBtu
$3,500
-
$
$14,747
-
$
$25,394
-
Tgal
05: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$76,391
Cost:
$42,250
- - - - $76,391 9,019 - - - - - - -
-
kWh
-
-
kW-months/year
$76,391
9,019
MMBtu
-
-
$
-
-
$
-
-
Tgal
06: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$74,909
Cost:
$77,050
- - - - $74,909 8,844 - - - - - - -
-
kWh
-
-
kW-months/year
$74,909
8,844
MMBtu
-
-
$
-
-
$
-
-
Tgal
07: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$41,893
Cost:
$112,000
- - - - $41,893 4,946 - - - - - - -
-
kWh
-
-
kW-months/year
$41,893
4,946
MMBtu
-
-
$
-
-
$
-
-
Tgal
08: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$26,961
Cost:
$1,000
$20,315 813,075 $8,443 1,114 - - $(-1,797) - - - - - $20,315
813,075
kWh
$8,443
1,114
kW-months/year
-
-
MMBtu
$(-1,797)
-
$
-
-
$
-
-
Tgal
09: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$26,439
Cost:
$2,700
- - $26,439 3,489 - - - - - - - - -
-
kWh
$26,439
3,489
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
10: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$23,049
Cost:
$280
$16,280 651,632 $6,769 893 - - - - - - - - $16,280
651,632
kWh
$6,769
893
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
11: 2.2511 INSULATE BARE EQUIPMENT Savings:
$18,125
Cost:
$2,570
- - - - $18,125 2,140 - - - - - - -
-
kWh
-
-
kW-months/year
$18,125
2,140
MMBtu
-
-
$
-
-
$
-
-
Tgal
12: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$15,068
Cost:
$1,000
- - - - $15,068 1,779 - - - - - - -
-
kWh
-
-
kW-months/year
$15,068
1,779
MMBtu
-
-
$
-
-
$
-
-
Tgal
13: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$11,020
Cost:
$1,348
$10,158 406,684 $4,222 557 - - $(-3,360) - - - - - $10,158
406,684
kWh
$4,222
557
kW-months/year
-
-
MMBtu
$(-3,360)
-
$
-
-
$
-
-
Tgal
14: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,759
Cost:
$35
$4,773 190,892 $1,986 262 - - - - - - - - $4,773
190,892
kWh
$1,986
262
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
15: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,938
Cost:
-
$2,782 111,340 $1,156 153 - - - - - - - - $2,782
111,340
kWh
$1,156
153
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
16: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,240
Cost:
$93
$1,581 63,387 $659 87 - - - - - - - - $1,581
63,387
kWh
$659
87
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
17: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,975
Cost:
$2,344
$1,596 63,847 $659 87 - - $(-280) - - - - - $1,596
63,847
kWh
$659
87
kW-months/year
-
-
MMBtu
$(-280)
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$795,728
Cost:
$744,170
$145,581 5,827,257 $86,944 11,472 $497,731 58,770 $(-2,462) - $34,747 - $33,187 - $145,581
5,827,257
kWh
$86,944
11,472
kW-months/year
$497,731
58,770
MMBtu
$(-2,462)
-
$
$34,747
-
$
$33,187
-
Tgal
TOTAL IMPLEMENTED Savings:
$714,641
Cost:
$667,027
$141,218 5,652,530 $85,129 11,232 $422,822 49,926 $(-2,462) - $34,747 - $33,187 - $141,218
5,652,530
kWh
$85,129
11,232
kW-months/year
$422,822
49,926
MMBtu
$(-2,462)
-
$
$34,747
-
$
$33,187
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption