Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2006 |
Principal Product | Incandescent Lamp Products |
NAICS | 335121 - Residential Electric Lighting Fixture Manufacturing |
SIC | 3645 - Residential Lighting Fixtures |
Sales | $100,000,000-$500,000,000 |
# of Employees | 401 |
Plant Area (Sq.Ft.) | 520,000 |
Annual Production | 500,000,000 Pieces |
Production Hrs. Annual | 8,400 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $647,790 | 27,470,798 | kWh | $0.02 |
Electricity Demand | $407,019 | 47,713 | kW-months/year | $8.53 |
Natural Gas | $1,714,379 | 171,617 | MMBtu | $9.99 |
TOTAL ENERGY COSTS | $2,769,188 | |||
RECOMMENDED SAVINGS* | $564,946 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $87,269 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION |
Savings: $390,000 Cost: $140,000 |
- | - | - | - | $390,000 | 39,000 | - | - |
- - kWh |
- - kW-months/year |
$390,000 39,000 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $38,402 Cost: $8,000 |
- | - | $38,402 | 4,502 | - | - | - | - |
- - kWh |
$38,402 4,502 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $35,574 Cost: $60,657 |
$21,875 | 918,260 | $13,699 | 1,606 | - | - | - | - |
$21,875 918,260 kWh |
$13,699 1,606 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $22,653 Cost: $26,300 |
$8,118 | 340,759 | $14,535 | 1,704 | - | - | - | - |
$8,118 340,759 kWh |
$14,535 1,704 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $15,346 Cost: $2,805 |
$10,351 | 434,512 | $5,295 | 621 | - | - | $(-300) | - |
$10,351 434,512 kWh |
$5,295 621 kW-months/year |
- - MMBtu |
$(-300) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM |
Savings: $14,670 Cost: $1,000 |
$10,414 | 437,156 | $5,323 | 624 | - | - | $(-1,067) | - |
$10,414 437,156 kWh |
$5,323 624 kW-months/year |
- - MMBtu |
$(-1,067) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7314 REDUCE VENTILATION AIR |
Savings: $10,829 Cost: $6,280 |
- | - | - | - | $10,829 | 1,084 | - | - |
- - kWh |
- - kW-months/year |
$10,829 1,084 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $9,402 Cost: $1,000 |
$5,775 | 242,311 | $3,627 | 425 | - | - | - | - |
$5,775 242,311 kWh |
$3,627 425 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $6,834 Cost: $10,400 |
$4,139 | 173,712 | $2,695 | 316 | - | - | - | - |
$4,139 173,712 kWh |
$2,695 316 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,809 Cost: $49,405 |
$4,216 | 176,966 | $2,593 | 304 | - | - | - | - |
$4,216 176,966 kWh |
$2,593 304 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $5,570 Cost: - |
$3,685 | 154,704 | $1,885 | 221 | - | - | - | - |
$3,685 154,704 kWh |
$1,885 221 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $5,468 Cost: $800 |
$5,207 | 218,578 | $2,661 | 312 | - | - | $(-2,400) | - |
$5,207 218,578 kWh |
$2,661 312 kW-months/year |
- - MMBtu |
$(-2,400) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $3,389 Cost: $6,500 |
$2,527 | 106,066 | $862 | 101 | - | - | - | - |
$2,527 106,066 kWh |
$862 101 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $564,946 Cost: $313,147 |
$76,307 | 3,203,024 | $91,577 | 10,736 | $400,829 | 40,084 | $(-3,767) | - | $76,307 3,203,024 kWh |
$91,577 10,736 kW-months/year |
$400,829 40,084 MMBtu |
$(-3,767) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $87,269 Cost: $115,667 |
$57,838 | 2,427,783 | $33,198 | 3,892 | - | - | $(-3,767) | - | $57,838 2,427,783 kWh |
$33,198 3,892 kW-months/year |
- - MMBtu |
$(-3,767) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |