IAC Center | West Virginia University |
---|---|
Assessment Year | 2006 |
Principal Product | Refractory materials & ceramic products |
NAICS | 327120 - Clay Building Material and Refractories Manufacturing |
SIC | 3297 - Nonclay Refractories |
Sales | $10,000,000-$50,000,000 |
# of Employees | 79 |
Plant Area (Sq.Ft.) | 84,000 |
Annual Production | 3,075 Tons |
Production Hrs. Annual | 6,240 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $204,408 | 2,492,160 | kWh | $0.08 |
Natural Gas | $295,981 | 28,569 | MMBtu | $10.36 |
TOTAL ENERGY COSTS | $500,389 | |||
RECOMMENDED SAVINGS* | $80,517 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $52,851 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Personnel Changes | Electricity Usage | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $22,813 Cost: $25,350 |
- | - | $22,813 | 2,202 | - | - |
- - kWh |
$22,813 2,202 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM |
Savings: $14,538 Cost: $3,000 |
- | - | $14,898 | 1,438 | $(-360) | - |
- - kWh |
$14,898 1,438 MMBtu |
$(-360) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7314 REDUCE VENTILATION AIR |
Savings: $10,762 Cost: $18,600 |
$4,494 | 54,791 | $6,268 | 605 | - | - |
$4,494 54,791 kWh |
$6,268 605 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,642 Cost: $8,678 |
$7,642 | 93,162 | - | - | - | - |
$7,642 93,162 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $7,373 Cost: $13,940 |
$(-625) | (-7,618) | $7,998 | 772 | - | - |
$(-625) (-7,618) kWh |
$7,998 772 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7314 REDUCE VENTILATION AIR |
Savings: $4,100 Cost: $6,800 |
$961 | 11,720 | $3,139 | 303 | - | - |
$961 11,720 kWh |
$3,139 303 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,260 Cost: - |
$2,260 | 27,556 | - | - | - | - |
$2,260 27,556 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM |
Savings: $1,808 Cost: $1,000 |
$2,715 | 33,109 | - | - | $(-907) | - |
$2,715 33,109 kWh |
- - MMBtu |
$(-907) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,346 Cost: $2,540 |
$1,346 | 16,391 | - | - | - | - |
$1,346 16,391 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $1,322 Cost: $560 |
$1,322 | 16,045 | - | - | - | - |
$1,322 16,045 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $1,274 Cost: $470 |
$1,274 | 15,397 | - | - | - | - |
$1,274 15,397 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,202 Cost: $270 |
$1,202 | 14,493 | - | - | - | - |
$1,202 14,493 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,081 Cost: $1,100 |
$1,081 | 13,185 | - | - | - | - |
$1,081 13,185 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,057 Cost: $390 |
$1,057 | 12,892 | - | - | - | - |
$1,057 12,892 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $866 Cost: $680 |
$1,346 | 16,408 | - | - | $(-480) | - |
$1,346 16,408 kWh |
- - MMBtu |
$(-480) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $545 Cost: $266 |
$625 | 7,727 | - | - | $(-80) | - |
$625 7,727 kWh |
- - MMBtu |
$(-80) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
17: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $528 Cost: $880 |
- | - | $528 | 51 | - | - |
- - kWh |
$528 51 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $80,517 Cost: $84,524 |
$26,700 | 325,258 | $55,644 | 5,371 | $(-1,827) | - | $26,700 325,258 kWh |
$55,644 5,371 MMBtu |
$(-1,827) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $52,851 Cost: $39,924 |
$16,967 | 206,899 | $37,711 | 3,640 | $(-1,827) | - | $16,967 206,899 kWh |
$37,711 3,640 MMBtu |
$(-1,827) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Personnel Changes | Electricity Usage | Natural Gas | Personnel Changes |