IAC Assessment: WV0353
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0353
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2007
Principal Product Pork and beef patties
NAICS 311612 - Meat Processed from Carcasses
SIC 2013 - Sausages And Other Prepared Meats
Sales $50,000,000-$100,000,000
# of Employees 270
Plant Area (Sq.Ft.) 65,000
Annual Production 50,000,000 Pounds
Production Hrs. Annual 4,160
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $335,582 14,407,296 kWh $0.02
Electricity Demand $268,559 31,594 kW-months/year $8.50
Electricity Fees $6,905 - $ -
Natural Gas $1,726,492 133,084 MMBtu $12.97
TOTAL ENERGY COSTS $2,337,538
RECOMMENDED SAVINGS* $441,921 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $70,692
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost Water Consumption One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost Water Consumption One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ Tgal $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$187,287
Cost:
$59,000
- - - - - - $187,287 14,440 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$187,287
14,440
MMBtu
-
-
$
-
-
$
-
-
Tgal
-
-
$
02: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$133,786
Cost:
$400,000
- - - - - - $133,786 10,315 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$133,786
10,315
MMBtu
-
-
$
-
-
$
-
-
Tgal
-
-
$
03: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$48,101
Cost:
$4,000
- - - - - - $48,261 3,721 $(-160) - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$48,261
3,721
MMBtu
$(-160)
-
$
-
-
$
-
-
Tgal
-
-
$
04: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$24,450
Cost:
$50,000
- - - - - - $22,360 1,724 - - $627 - $1,463 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$22,360
1,724
MMBtu
-
-
$
$627
-
$
$1,463
-
Tgal
-
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$13,839
Cost:
$2,960
- - - - - - $13,839 1,067 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$13,839
1,067
MMBtu
-
-
$
-
-
$
-
-
Tgal
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,776
Cost:
$300
$6,574 282,376 $2,202 259 - - - - - - - - - - - - $6,574
282,376
kWh
$2,202
259
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,148
Cost:
$19,000
$3,705 159,185 $3,443 405 - - - - - - - - - - - - $3,705
159,185
kWh
$3,443
405
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
-
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,712
Cost:
$400
$743 31,796 $144 17 - - $4,825 372 - - - - - - - - $743
31,796
kWh
$144
17
kW-months/year
-
-
$
$4,825
372
MMBtu
-
-
$
-
-
$
-
-
Tgal
-
-
$
09: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,799
Cost:
$17,500
- - - - $4,799 - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$4,799
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
-
-
$
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,101
Cost:
$3,500
$2,321 99,729 $780 137 - - - - - - - - - - - - $2,321
99,729
kWh
$780
137
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
-
-
$
11: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,883
Cost:
$400
$1,438 61,823 $1,405 165 - - - - $(-960) - - - - - - - $1,438
61,823
kWh
$1,405
165
kW-months/year
-
-
$
-
-
MMBtu
$(-960)
-
$
-
-
$
-
-
Tgal
-
-
$
12: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,356
Cost:
$200
$1,016 43,579 $340 40 - - - - - - - - - - - - $1,016
43,579
kWh
$340
40
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
-
-
$
13: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$887
Cost:
$200
$887 38,227 - - - - - - - - - - - - - - $887
38,227
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
-
-
$
14: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$796
Cost:
$3,000
$552 23,729 - - - - - - - - - - - - $244 - $552
23,729
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
$244
-
$
TOTAL RECOMMENDED Savings:
$441,921
Cost:
$560,460
$17,236 740,444 $8,314 1,023 $4,799 - $410,358 31,639 $(-1,120) - $627 - $1,463 - $244 - $17,236
740,444
kWh
$8,314
1,023
kW-months/year
$4,799
-
$
$410,358
31,639
MMBtu
$(-1,120)
-
$
$627
-
$
$1,463
-
Tgal
$244
-
$
TOTAL IMPLEMENTED Savings:
$70,692
Cost:
$30,400
$15,477 665,069 $7,830 966 - - $48,261 3,721 $(-1,120) - - - - - $244 - $15,477
665,069
kWh
$7,830
966
kW-months/year
-
-
$
$48,261
3,721
MMBtu
$(-1,120)
-
$
-
-
$
-
-
Tgal
$244
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ Tgal $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost Water Consumption One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost Water Consumption One-time Revenue or Avoided Cost