IAC Assessment: WV0369
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0369
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2008
Principal Product Transformers
NAICS 335311 - Power, Distribution, and Specialty Transformer Manufacturing
SIC 3612 - Transformers, Except Electronic
Sales $50,000,000-$100,000,000
# of Employees 311
Plant Area (Sq.Ft.) 700,000
Annual Production 130 Pieces
Production Hrs. Annual 3,744
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $554,848 13,471,510 kWh $0.04
Electricity Demand $177,315 33,497 kW-months/year $5.29
Electricity Fees $1,838 - $ -
Natural Gas $737,772 73,846 MMBtu $9.99
TOTAL ENERGY COSTS $1,471,773
RECOMMENDED SAVINGS* $314,272 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $206,132
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$108,677
Cost:
-
- - - - - - - - - - $108,677 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$108,677
-
$
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$77,536
Cost:
$198,000
$(-7,184) (-174,377) $(-2,962) (-560) - - $87,682 8,777 - - - - $(-7,184)
(-174,377)
kWh
$(-2,962)
(-560)
kW-months/year
-
-
$
$87,682
8,777
MMBtu
-
-
$
-
-
$
03: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$48,102
Cost:
$41,400
- - - - - - $48,102 4,815 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$48,102
4,815
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,982
Cost:
$71,794
$13,449 326,443 $5,533 1,046 - - - - - - - - $13,449
326,443
kWh
$5,533
1,046
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$16,912
Cost:
$8,070
- - $16,912 3,197 - - - - - - - - -
-
kWh
$16,912
3,197
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$7,680
Cost:
$24,500
- - - - $7,680 - - - - - - - -
-
kWh
-
-
kW-months/year
$7,680
-
$
-
-
MMBtu
-
-
$
-
-
$
07: 2.2522 ISOLATE HOT OR COLD EQUIPMENT Savings:
$5,682
Cost:
$952
$(-85) (-2,051) $(-37) (-7) - - $5,804 581 - - - - $(-85)
(-2,051)
kWh
$(-37)
(-7)
kW-months/year
-
-
$
$5,804
581
MMBtu
-
-
$
-
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,504
Cost:
$2,520
- - - - - - $5,504 551 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$5,504
551
MMBtu
-
-
$
-
-
$
09: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$5,365
Cost:
$11,160
- - - - - - $5,365 537 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$5,365
537
MMBtu
-
-
$
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,950
Cost:
-
$3,506 85,080 $1,444 273 - - - - - - - - $3,506
85,080
kWh
$1,444
273
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
11: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$2,687
Cost:
$1,000
$2,165 52,547 $889 168 - - - - $(-367) - - - $2,165
52,547
kWh
$889
168
kW-months/year
-
-
$
-
-
MMBtu
$(-367)
-
$
-
-
$
12: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,264
Cost:
$2,000
- - - - - - $2,378 238 $(-114) - - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,378
238
MMBtu
$(-114)
-
$
-
-
$
13: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$2,047
Cost:
$776
$1,449 35,160 $598 113 - - - - - - - - $1,449
35,160
kWh
$598
113
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
14: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,008
Cost:
$1,241
- - - - - - $2,008 201 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,008
201
MMBtu
-
-
$
-
-
$
15: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,004
Cost:
$87
$1,570 38,098 $434 82 - - - - - - - - $1,570
38,098
kWh
$434
82
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
16: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,266
Cost:
$114
$991 24,047 $275 52 - - - - - - - - $991
24,047
kWh
$275
52
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
17: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$835
Cost:
-
$592 14,357 $243 46 - - - - - - - - $592
14,357
kWh
$243
46
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
18: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$819
Cost:
$1,484
$560 13,604 $259 49 - - - - - - - - $560
13,604
kWh
$259
49
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
19: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$563
Cost:
$585
$441 10,712 $122 23 - - - - - - - - $441
10,712
kWh
$122
23
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
20: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$389
Cost:
$470
$304 7,371 $85 16 - - - - - - - - $304
7,371
kWh
$85
16
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$314,272
Cost:
$366,153
$17,758 430,991 $23,795 4,498 $7,680 - $156,843 15,700 $(-481) - $108,677 - $17,758
430,991
kWh
$23,795
4,498
kW-months/year
$7,680
-
$
$156,843
15,700
MMBtu
$(-481)
-
$
$108,677
-
$
TOTAL IMPLEMENTED Savings:
$206,132
Cost:
$144,832
$22,812 553,666 $9,152 1,730 $7,680 - $58,292 5,835 $(-481) - $108,677 - $22,812
553,666
kWh
$9,152
1,730
kW-months/year
$7,680
-
$
$58,292
5,835
MMBtu
$(-481)
-
$
$108,677
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes