Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2012 |
Principal Product | Plastic injection molded containers |
NAICS | 326199 - All Other Plastics Product Manufacturing |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 74 |
Plant Area (Sq.Ft.) | 102,500 |
Annual Production | 14,400,000 Pounds |
Production Hrs. Annual | 5,760 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $490,682 | 8,888,163 | kWh | $0.06 |
Electricity Demand | $259,185 | 21,758 | kW-months/year | $11.91 |
Electricity Fees | $1,200 | - | $ | - |
Natural Gas | $100,324 | 10,652 | MMBtu | $9.42 |
TOTAL ENERGY COSTS | $851,391 | |||
RECOMMENDED SAVINGS* | $94,887 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $29,038 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $23,150 Cost: $21,800 |
$13,074 | 236,801 | $10,076 | 846 | - | - | - | - |
$13,074 236,801 kWh |
$10,076 846 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $25,360 Cost: $36,050 |
$17,499 | 316,961 | $7,861 | 660 | - | - | - | - |
$17,499 316,961 kWh |
$7,861 660 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4156 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM |
Savings: $10,500 Cost: $2,000 |
$7,541 | 136,594 | $3,389 | 285 | - | - | $(-430) | - |
$7,541 136,594 kWh |
$3,389 285 kW-months/year |
- - MMBtu |
$(-430) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY |
Savings: $9,797 Cost: $44,000 |
- | - | - | - | $9,797 | 1,040 | - | - |
- - kWh |
- - kW-months/year |
$9,797 1,040 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $8,028 Cost: $823 |
$6,033 | 109,275 | $2,715 | 228 | - | - | $(-720) | - |
$6,033 109,275 kWh |
$2,715 228 kW-months/year |
- - MMBtu |
$(-720) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4312 IMPROVE LUBRICATION PRACTICES |
Savings: $4,733 Cost: $3,930 |
$3,268 | 59,186 | $1,465 | 123 | - | - | - | - |
$3,268 59,186 kWh |
$1,465 123 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $4,089 Cost: $1,440 |
$4,089 | 74,071 | - | - | - | - | - | - |
$4,089 74,071 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $3,442 Cost: $3,000 |
$2,370 | 42,924 | $1,072 | 90 | - | - | - | - |
$2,370 42,924 kWh |
$1,072 90 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $2,501 Cost: $563 |
$1,727 | 31,282 | $774 | 65 | - | - | - | - |
$1,727 31,282 kWh |
$774 65 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,414 Cost: $2,980 |
$1,176 | 21,307 | $238 | 20 | - | - | - | - |
$1,176 21,307 kWh |
$238 20 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $952 Cost: $1,700 |
$654 | 11,852 | $298 | 25 | - | - | - | - |
$654 11,852 kWh |
$298 25 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $688 Cost: $599 |
$474 | 8,586 | $214 | 18 | - | - | - | - |
$474 8,586 kWh |
$214 18 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $233 Cost: $60 |
$162 | 2,938 | $71 | 6 | - | - | - | - |
$162 2,938 kWh |
$71 6 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $94,887 Cost: $118,945 |
$58,067 | 1,051,777 | $28,173 | 2,366 | $9,797 | 1,040 | $(-1,150) | - | $58,067 1,051,777 kWh |
$28,173 2,366 kW-months/year |
$9,797 1,040 MMBtu |
$(-1,150) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $29,038 Cost: $13,392 |
$21,024 | 380,810 | $9,164 | 770 | - | - | $(-1,150) | - | $21,024 380,810 kWh |
$9,164 770 kW-months/year |
- - MMBtu |
$(-1,150) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |