IAC Assessment: WV0488
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0488
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2014
Principal Product Custom Extrusion
NAICS 326121 - Unlaminated Plastics Profile Shape Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 46
Plant Area (Sq.Ft.) 90,000
Annual Production 300,000 Pounds
Production Hrs. Annual 6,240
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $85,258 1,067,040 kWh $0.08
Electricity Demand $21,109 3,186 kW-months/year $6.63
Natural Gas $17,157 2,226 MMBtu $7.71
TOTAL ENERGY COSTS $123,524
RECOMMENDED SAVINGS* $16,944 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,426
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,665
Cost:
$9,243
$3,657 45,767 $1,008 152 - - - - $3,657
45,767
kWh
$1,008
152
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$2,722
Cost:
$6,898
- - - - $2,722 353 - - -
-
kWh
-
-
kW-months/year
$2,722
353
MMBtu
-
-
$
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,735
Cost:
$214
- - - - $1,735 225 - - -
-
kWh
-
-
kW-months/year
$1,735
225
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,681
Cost:
$1,893
$1,449 18,131 $232 35 - - - - $1,449
18,131
kWh
$232
35
kW-months/year
-
-
MMBtu
-
-
$
05: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$1,558
Cost:
$4,320
- - $1,558 235 - - - - -
-
kWh
$1,558
235
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,203
Cost:
$1,160
- - - - $1,203 156 - - -
-
kWh
-
-
kW-months/year
$1,203
156
MMBtu
-
-
$
07: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$1,003
Cost:
$1,000
$1,787 22,364 $285 43 - - $(-1,069) - $1,787
22,364
kWh
$285
43
kW-months/year
-
-
MMBtu
$(-1,069)
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$901
Cost:
$16
$775 9,701 $126 19 - - - - $775
9,701
kWh
$126
19
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$571
Cost:
$120
$491 6,145 $80 12 - - - - $491
6,145
kWh
$80
12
kW-months/year
-
-
MMBtu
-
-
$
10: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$444
Cost:
$320
$384 4,809 $60 9 - - - - $384
4,809
kWh
$60
9
kW-months/year
-
-
MMBtu
-
-
$
11: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$327
Cost:
$221
$322 4,026 $53 8 - - $(-48) - $322
4,026
kWh
$53
8
kW-months/year
-
-
MMBtu
$(-48)
-
$
12: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$134
Cost:
$150
$114 1,430 $20 3 - - - - $114
1,430
kWh
$20
3
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$16,944
Cost:
$25,555
$8,979 112,373 $3,422 516 $5,660 734 $(-1,117) - $8,979
112,373
kWh
$3,422
516
kW-months/year
$5,660
734
MMBtu
$(-1,117)
-
$
TOTAL IMPLEMENTED Savings:
$10,426
Cost:
$13,011
$8,090 101,242 $1,718 259 $1,735 225 $(-1,117) - $8,090
101,242
kWh
$1,718
259
kW-months/year
$1,735
225
MMBtu
$(-1,117)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes