IAC logo
IAC Assessment: WV0500
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0500
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2015
Principal Product automotive heat shields
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 43,000
Annual Production 3,000,000 Pieces
Production Hrs. Annual 6,120
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $163,566 1,633,280 kWh $0.10
Electricity Demand $26,435 3,834 kW-months/year $6.89
TOTAL ENERGY COSTS $190,001
RECOMMENDED SAVINGS* $27,205 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,165
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,981
Cost:
$10,019
$11,435 114,240 $1,546 224 - - $11,435
114,240
kWh
$1,546
224
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,178
Cost:
$4,647
$2,798 27,956 $380 55 - - $2,798
27,956
kWh
$380
55
kW-months/year
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,013
Cost:
$20
$2,653 26,507 $360 52 - - $2,653
26,507
kWh
$360
52
kW-months/year
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,650
Cost:
-
- - $2,650 384 - - -
-
kWh
$2,650
384
kW-months/year
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,477
Cost:
-
$2,180 21,780 $297 43 - - $2,180
21,780
kWh
$297
43
kW-months/year
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,390
Cost:
$11,630
$2,107 21,048 $283 41 - - $2,107
21,048
kWh
$283
41
kW-months/year
-
-
$
07: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$516
Cost:
$542
$1,091 10,895 $145 21 $(-720) - $1,091
10,895
kWh
$145
21
kW-months/year
$(-720)
-
$
TOTAL RECOMMENDED Savings:
$27,205
Cost:
$26,858
$22,264 222,426 $5,661 820 $(-720) - $22,264
222,426
kWh
$5,661
820
kW-months/year
$(-720)
-
$
TOTAL IMPLEMENTED Savings:
$22,165
Cost:
$15,228
$20,157 201,378 $2,728 395 $(-720) - $20,157
201,378
kWh
$2,728
395
kW-months/year
$(-720)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes