IAC Assessment: WV0502
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0502
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2015
Principal Product Ice cream and yogurt
NAICS 311520 - Ice Cream and Frozen Dessert Manufacturing
SIC 2024 - Ice Cream And Frozen Desserts
Sales $1,000,000-$5,000,000
# of Employees 80
Plant Area (Sq.Ft.) 91,000
Annual Production 10,000,000 Units
Production Hrs. Annual 2,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $275,008 4,609,558 kWh $0.06
Electricity Demand $202,043 14,022 kW-months/year $14.41
Natural Gas $35,232 5,516 MMBtu $6.39
TOTAL ENERGY COSTS $512,283
RECOMMENDED SAVINGS* $63,010 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,009
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$13,685
Cost:
$1,000
$6,792 113,767 $9,640 669 - - - - $(-2,747) - $6,792
113,767
kWh
$9,640
669
kW-months/year
-
-
$
-
-
MMBtu
$(-2,747)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,334
Cost:
$25,930
$8,406 140,800 $4,928 342 - - - - - - $8,406
140,800
kWh
$4,928
342
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$12,681
Cost:
$18,000
$9,525 159,543 $3,156 219 - - - - - - $9,525
159,543
kWh
$3,156
219
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,838
Cost:
$20,000
$5,139 86,075 $1,699 118 - - - - - - $5,139
86,075
kWh
$1,699
118
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$6,333
Cost:
$2,500
$4,762 79,772 $1,571 109 - - - - - - $4,762
79,772
kWh
$1,571
109
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,830
Cost:
$16,400
- - - - $3,830 - - - - - -
-
kWh
-
-
kW-months/year
$3,830
-
$
-
-
MMBtu
-
-
$
07: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$3,350
Cost:
$724
$1,711 28,654 $2,479 172 - - - - $(-840) - $1,711
28,654
kWh
$2,479
172
kW-months/year
-
-
$
-
-
MMBtu
$(-840)
-
$
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,826
Cost:
$500
- - - - - - $1,879 294 $(-53) - -
-
kWh
-
-
kW-months/year
-
-
$
$1,879
294
MMBtu
$(-53)
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$812
Cost:
$2,934
- - - - - - $812 127 - - -
-
kWh
-
-
kW-months/year
-
-
$
$812
127
MMBtu
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$321
Cost:
$854
$134 2,246 $187 13 - - - - - - $134
2,246
kWh
$187
13
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$63,010
Cost:
$88,842
$36,469 610,857 $23,660 1,642 $3,830 - $2,691 421 $(-3,640) - $36,469
610,857
kWh
$23,660
1,642
kW-months/year
$3,830
-
$
$2,691
421
MMBtu
$(-3,640)
-
$
TOTAL IMPLEMENTED Savings:
$46,009
Cost:
$49,942
$26,568 445,010 $20,390 1,415 - - $2,691 421 $(-3,640) - $26,568
445,010
kWh
$20,390
1,415
kW-months/year
-
-
$
$2,691
421
MMBtu
$(-3,640)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes